Similar Projects
2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 PTHS Asphalt Maintenance
Infrastructure
Post-Bid
$350,000 to $400,000 est. value
Pontiac, IL

Furnish and Apply on Road
Results
Less than $4,149,312 est. value
Pontiac, IL

Resurfcing CH 6/CH 1 from Chestnut Street
Results
Fairbury, IL 61739

Road Resurfacing
Infrastructure
Post-Bid
Flanagan, IL

FAP 786 (IL 170) Beginning at the Intersection of IL 170 and N 21st Rd in LaSalle County and Ending at the Intersection of IL 170 and IL 17 in Livingston County (12.0 miles)
Results
Grand Ridge, IL 61325

Furnish and Deliver to Jobsite: 3,300 Ton CA-6 or 10
Alteration
Post-Bid
Pontiac, IL

3p Milling and Resurfacing (Smart Overlay) ADA Improvement and Minor Drainage Improvement from IL 116 In Saunemin To US 24 In Forrest
Infrastructure
Results
Forrest, Saunemin, IL 61769

Furnish and Deliver to Jobsite: 3,445 Ton CA-6 or 10
Alteration
Post-Bid
Pontiac, IL

Pavement Patching and Pavement Striping
Infrastructure
Results

5,390 Sq Yd Fd Reclamation, 8.0", 2,000 100 Wt Cement
Infrastructure
Post-Bid
Pontiac, IL

Pavement Reconstruction, Storm Sewers, Curb and Gutter, Sidewalks and Pavement Markings
Infrastructure
Results
IL

3P Milling and Resurfacing
Infrastructure
Post-Bid
IL

Seal Coat
Infrastructure
Results
Forrest, IL

2022 HMA Maintenance Project
Infrastructure
Post-Bid
$200,000 est. value
Pontiac, IL

Last Updated 06/22/2022 01:19 AM
Project Title

Milling and Resurfacing (Designed Overlay) with ADA Sidewalk Work

Physical Address View project details and contacts
City, State (County) Saunemin, IL 61769   (Livingston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work is located at FAP 326 (IL 47) from US 24 in Forrest to Ford County line in Livingston County (+/-9.35 miles). This work consists of milling and resurfacing (designed overlay) with ADA sidewalk work. Region 2 District 3 Federal Project # N/A County(s) Livingston Key Route(s) FAP 326 Marked Route(s) IL 47 Section(s) (124,125)RS,SW State Job #(s) C-93-020-22 PPS #(s) 3-04753-0000 Completion Date: 75 Working Days Questions not accepted as of June 07, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 08, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 027 - Milling and Resurfacing (Designed Overlay) with ADA Sidewalk Work This is a 3P milling and resurfacing project. The work consists of milling at 3.75" and resurfacing with 2.25" HMA Binder and 1.50" of HMA surface course. The project also includes ADA improvement and drainage improvements. It extends from US 24 in Forrest IL to the Ford County

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents