Similar Projects
I-196 BL From US-31 East to I-196 Road Rehabilitation
Infrastructure
Conception
$28,500,000 est. value
Zeeland, MI 49464

Community Recreation Center - Holland Charter Township
Infrastructure, Renovation
Design
$12,000,000 CJ est. value
Holland, MI 49423

Community Recreation Center - Holland Charter Township
Infrastructure, Renovation
Design
$12,000,000 CJ est. value
Holland, MI 49423

Hudsonville Public Schools - Park Elementary Addition & Remodel
Addition, Demolition, Build-out, Infrastructure
Bidding
$8,000,000 CJ est. value
Hudsonville, MI 49426

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

8.06 Mi of Hot Mix Asphalt Cold Milling and Resurfacing, Median Crossover, Widening, Aggregate Base Drainage, Signing and Pavement Markings
Infrastructure
Results
Zeeland, MI 49464

Request Foods Cold Storage Warehouse - Ransom Street
New Construction, Infrastructure
Construction
$55,000,000 CJ est. value
Holland, MI 49424

Gentex Corporation Manufacturing Facility And Distribution Center
Addition, Demolition, New Construction, Infrastructure - 600,000 SF
Construction
$300,000,000 CJ est. value
Zeeland, MI 49464

Dwelling Place Multi-Residential
New Construction, Infrastructure - 48,765 SF
Pending Verification
$18,000,000 CJ est. value
Holland, MI 49423

The Commons At Westshore
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Holland, MI 49423

Holland Public Schools - 2021 Bond - Holland Middle Schools, New Storage Facility
New Construction, Build-out, Renovation, Infrastructure
Design
$72,650,000 CJ est. value
Holland, MI 49423

High School Repaving Project
Infrastructure
Post-Bid
Allendale, MI 49401

I-196 Watermain Crossing
Infrastructure
Results
$145,000 est. value
Hudsonville, MI

Last Updated 04/13/2023 03:31 AM
Project Title

16th Avenue from Riley Street to Greenly Street

Physical Address View project details and contacts
City, State (County) Holland, MI 49423   (Ottawa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $668,607 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work on this project shall consist of 0.5 mile of road reconstruction and shared use path construction, including culverts, storm sewer, concrete block retaining wall, grading, subbase, aggregate base, concrete curb and gutter, aggregate and HMA driveways, HMA leveling and top courses, aggregate shoulders and restoration in Jamestown Township, Ottawa County. The Commission reserves the right to reject any and all bids, and award the Contract in any manner to be in the best interest of the County of Ottawa.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents