Similar Projects
PQ List for HVAC Rehabilitation, Repairs and Renovation Services (CD)
Term Contract
Bidding
Pittsburgh, PA 15219

PQ List for HVAC Rehab/Repair/Reno
Bidding
Pittsburgh, PA 15219

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Mechanical (HVAC) Rehabilitation, Repair and Renovation of Various Sites (Including Cdbg Areas)
Post-Bid
Pittsburgh, PA

Air Conditioning for Offices
Results
Pittsburgh, PA

Exhaust System Modernization
Results
Pittsburgh, PA 15123

Construction of Workforce Development & Training Center - HVAC
Bidding
$30,000,000 to $40,000,000 est. value
Pittsburgh, PA 15212

Hvac and Refrigeration Service and Maintenance
Post-Bid
PA

Phillips K-5 Air Conditioning Offices Mechanical Prime
Results
Pittsburgh, PA 15123

Installation of Chilled Water Bypass Valves
Post-Bid
$85,000 est. value
Pittsburgh, PA

HVAC On Call Service
Results
Pittsburgh, PA

Replace Classrm Relief Dampers
Post-Bid
Pittsburgh, PA

Preventive Maintenance for Allegheny County Jail Chiller Plant II
Term Contract
Results
Pittsburgh, PA 15219

Replace the HVAC Equipment at the Baierl Center
Post-Bid
Wexford, PA 15090

Maintenance Facility HVAC Work
Results

Last Updated 01/29/2019 01:40 PM
Project Title

Y--Project 646-16-109 UD Replace Kitchen

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15240   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project # 646-16-109: Replace Kitchen AHU - contractor shall be required to provide all work, labor, material, equipment and supervision to perform the work as described by the drawings and specifications; including general construction, demolition and alteration of existing construction, structural, mechanical, electrical, plumbing, fire protection, hazardous material removal, utility systems, necessary alteration of existing structure and construction, and certain other items.
Details
Division 02 - Existing Conditions, Hazardous Material Assessment, Demolition, Selective Demolition, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 09 - Finishes.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents