Similar Projects
2022 Roadway and Sidewalk Improvements
Infrastructure
Bidding
$5,500,000 est. value
Springfield, MA

Replacement of Network Vault Cover 452
Post-Bid
Holyoke, MA

2022 Sidewalk Replacement Project
Infrastructure
Post-Bid
$1,000,000 est. value
Holyoke, MA

2020 CDBG Sidewalk Replacement Project
Results
Less than $100,000 est. value
Holyoke, MA 01040

Sidewalk and ADA Improvements at Various Locations
Results
Less than $1,148,661 est. value

Preservation of Roads, Driveways and Parking Lots
Infrastructure
Post-Bid
$635,000 est. value
Agawam, MA

Massachusetts Hospital Sidewalk Replacement Project Phase 2
Results
Less than $90,000 est. value
Westfield, MA 01085

ADA Sidewalk Project
Infrastructure
Post-Bid
$200,000 est. value
East Longmeadow, MA

Maintenance of Roads, Sidewalks, Driveways and Parking Lots
Results
$1,100,000 est. value
Agawam, MA

Installation of Portland Cement Concrete Sidewalk
Infrastructure
Post-Bid
$130,000 est. value
Longmeadow, MA

Walkway Improvements, Governor Robinson Apartments 667-1A & Volpe 705-1
Results
$468,573 est. value
Chicopee, MA

Concrete Sidewalks, Driveways, Wheelchair Ramps, Bike Pads and Thermoplastic Pavement Markings at Various Locations Within the City
Infrastructure
Post-Bid
$1,300,000 est. value
Springfield, MA

Western Ma Road and Trail Improvements
Results
$4,000,000 est. value
Franklin, Hampden, Worcester, MA

Blueberry Hill School Asphalt Sidewalk
Infrastructure
Post-Bid
$11,000 est. value
Longmeadow, MA 01106

Sidewalk Replacement Project
Results
$366,194 est. value
Longmeadow, MA

Last Updated 05/23/2022 12:59 AM
Project Title

2022 Sidewalk Program

Physical Address View project details and contacts
City, State (County) Springfield, MA   (Hampden County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the construction of concrete sidewalks, driveways, wheelchair ramps, bike pads and thermoplastic pavement markings at various locations within the City of Springfield.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 04 - Masonry.
Division 10 - Specialties.
Division 14 - Conveying Equipment.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents