Similar Projects
Lacrosse - Westby, Brickyard Lane to CTH M
Bidding
La Crosse, Westby, WI 54602

Lacrosse - Westby, Brickyard Lane to CTH M
Bidding
La Crosse, Westby, WI 54602

6th Avenue and 28th Street Pulverizing & Relay, Limestone Base Replacement
Post-Bid
$64,000 est. value
Camp Douglas, WI 54618

2020 Freedom Road Paving
Post-Bid
North Freedom, WI 53951

Street Resurfacing - Walnut Road And Lakeshore Way
Results
Twin Lakes, WI 53181

Resurface & Expand Privately Owned Vehicle Parking - General
Results
$340,000 est. value
Eau Claire, WI 54702

Star Prairie - Osceola, Scl to Cth Y
Bidding
Osceola, Star Prairie, WI

Temporary Bypass Road Contract
Post-Bid
Less than $126,000 est. value
Hobart, WI 54155

Concrete Alley Pavement
New Construction
Results
Milwaukee, WI 53202

Eau Claire, N. Clairemont Avenue, Sth 312 To County Line Road
Bidding
Eau Claire, WI 54701

Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

Paving Work
New Construction
Results
Milwaukee, WI 53202

Adler Road Reconstruction
Renovation - 4,118 SF
Post-Bid
$25,000 to $100,000 est. value
Ashland, WI 54855

Bioswale
New Construction
Results
Milwaukee, WI

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Last Updated 11/17/2020 09:47 AM
Project Title

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF

Physical Address View project details and contacts
City, State (County) State-Wide: MI, WI
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000 to $7,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Projects will primarily be located on the Chequamegon-Nicolet National Forest. However, task orders may also be issued for other Forest Service units located within Wisconsin, Minnesota, and Michigan. Specific project areas will be identified on each Task Order. Work contemplated as part of the IDIQs includes general road, bridge, structure, and site work as identified, but not limited to: Road: Work includes repair and construction of native surface, gravel or paved roads; and road repair and reconstruction due to damage from human or natural causes. Motorized and Non-motorized trails: Work includes repair and construction of native surface or surfaced trails; and trail repair and reconstruction due to damage from human or natural causes. Road decommissioning: Work includes de-compaction, partial or full re-contour to restore the roadway to a hydrological stable condition; removal of drainage structures and associated fill to restore site to natural contour; work may include excavation of stream channels without drainage structures; installation of gradient control devices in channels or sediment basins; tree transplanting; rock/log scattering; seeding, fertilizing and mulching; and the construction of water bars. Construction: Demolition/construction of small non-residential building. Bridge: Work includes repair and construction of steel, concrete, and timber road bridges; reconstruction of approaches; and related stream work within the project area. Trail bridges readily accessible by conventional road building equipment: Work includes construction or reconstruction of bridge. Site will be accessible from National Forest system roads or trails, or other public roads. Culverts, Aquatic Passage Structures, and Ancillary Structures: Work includes road structures for aquatic passages, bottomless arches, small bridges, retaining walls, and cattle guards that are part of National Forest roads. Stream restoration work: work within a warm or cold water stream to restore the steam channel. Related work includes signs; guardrails; closure devices such as gates, cattle guards, fences; stream grade; alignment control; and scour protection. Gravel pit development: scalping, clearing and grubbing, working face development, and related work (NOT including gravel crushing). General excavation work typically associated with excavation companies. Including but not limited to: installation of septic systems, building footing excavation and replacement, and related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents