Similar Projects
Last Updated | 11/17/2020 09:47 AM |
Project Title | Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: MI, WI |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,000 to $7,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Projects will primarily be located on the Chequamegon-Nicolet National Forest. However, task orders may also be issued for other Forest Service units located within Wisconsin, Minnesota, and Michigan. Specific project areas will be identified on each Task Order. Work contemplated as part of the IDIQs includes general road, bridge, structure, and site work as identified, but not limited to: Road: Work includes repair and construction of native surface, gravel or paved roads; and road repair and reconstruction due to damage from human or natural causes. Motorized and Non-motorized trails: Work includes repair and construction of native surface or surfaced trails; and trail repair and reconstruction due to damage from human or natural causes. Road decommissioning: Work includes de-compaction, partial or full re-contour to restore the roadway to a hydrological stable condition; removal of drainage structures and associated fill to restore site to natural contour; work may include excavation of stream channels without drainage structures; installation of gradient control devices in channels or sediment basins; tree transplanting; rock/log scattering; seeding, fertilizing and mulching; and the construction of water bars. Construction: Demolition/construction of small non-residential building. Bridge: Work includes repair and construction of steel, concrete, and timber road bridges; reconstruction of approaches; and related stream work within the project area. Trail bridges readily accessible by conventional road building equipment: Work includes construction or reconstruction of bridge. Site will be accessible from National Forest system roads or trails, or other public roads. Culverts, Aquatic Passage Structures, and Ancillary Structures: Work includes road structures for aquatic passages, bottomless arches, small bridges, retaining walls, and cattle guards that are part of National Forest roads. Stream restoration work: work within a warm or cold water stream to restore the steam channel. Related work includes signs; guardrails; closure devices such as gates, cattle guards, fences; stream grade; alignment control; and scour protection. Gravel pit development: scalping, clearing and grubbing, working face development, and related work (NOT including gravel crushing). General excavation work typically associated with excavation companies. Including but not limited to: installation of septic systems, building footing excavation and replacement, and related work. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |