Similar Projects
Jomax Water Reclamation Facility Expansion - UT00388 - City of Peoria
Addition, Infrastructure
Conception
$65,499,546 CJ est. value
Peoria, AZ 85383

Sarival Avenue: Jefferson Street to Yuma Rd - 42011 - City Of Goodyear
Infrastructure
Conception
$5,300,000 est. value
Goodyear, AZ 85338

Chinle Strip Center
New Construction, Infrastructure - 13,000 SF
Design
$3,400,000 CJ est. value
Chinle, AZ 86503

Chinle Strip Center
New Construction, Infrastructure - 13,000 SF
Design
$3,400,000 CJ est. value
Chinle, AZ 86503

Taxiway W Rehabilitation
Infrastructure
Post-Bid
$2,081,551 CJ est. value
Mesa, AZ 85212

Taxiway W Rehabilitation
Infrastructure
Post-Bid
$2,081,551 CJ est. value
Mesa, AZ 85212

Sidewalk/Driveway Construction - McClintock Drive/Multiple Locations
Infrastructure
Results
AZ

PRCF Playground and Aquatic Facility Poured in Place Surfacing and Synthetic Turf Repairs, Maintenance, and Installation
Infrastructure
Results
$500,000 CJ est. value
Mesa, AZ 85201

Ono Hawaiian BBQ / Phoenix
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Phoenix, AZ 85037

Cannon Beach Surf Lake - Sitework
New Construction
Construction
Mesa, AZ 85212

250 Rio / Tempe
New Construction, Infrastructure - 216,000 SF
Pending Verification
$40,000,000 CJ est. value
Tempe, AZ 85281

Portillo's / Gilbert
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Gilbert, AZ 85295

Signal Butte Park Phase 2 - CP0707 - City of Mesa
Infrastructure
Conception
$2,709,737 CJ est. value
Mesa, AZ 85212

Child Crisis Arizona headquarters
New Construction, Infrastructure
Design
$9,000,000 CJ est. value
Mesa, AZ 85201

Solana Villas
New Construction, Infrastructure - 309,000 SF
Post-Bid
$60,000,000 CJ est. value
Buckeye, AZ 85326

Last Updated 02/14/2024 08:04 AM
Project Title

Sossaman Road - Warner Road to Ray Road

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85209   (Maricopa County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $5,250,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor and materials to build the Sossaman Road street section from Ray Road north through the ADOT right of way under the 202 including two bridges over the drainage channels, sidewalks, streetlights, traffic signals, striping, signage, and all other features will be included per the approved plans. Installation of full width Sossaman Road, from Ray Road north through the Arizona Department of Transportation Right-of-way under State Route 202, including two bridges over the drainage channels. The right is hereby reserved to accept or reject any or all bids or parts thereto, to waive any informalities in any proposal and reject the bids of any persons who have been delinquent or unfaithful to any contract with the City of Mesa. Bids must be submitted on the Proposal Form provided and be accompanied by the Bid Bond for not less than ten percent (10%) of the total bid, payable to the City of Mesa, Arizona, or a certified or cashier's check. PERSONAL OR INDIVIDUAL SURETY BONDS ARE NOT ACCEPTABLE The successful bidder will be required to execute the standard form of contract for construction within ten (10) days after formal award of contract. In addition, the successful bidder must be registered in the City of Mesa Vendor Self-Service (VSS) System (http://mesaaz.gov/business/purchasing/vendor-self-service). The successful bidder, simultaneously with the execution of the Contract, will be required to furnish a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price, a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Price, and the most recent ACORD Certificate of Liability Insurance form with additional insured endorsements. Addendum #1-#3 have been issued as of 2-8-2024.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents