Similar Projects
S207--Pest Control Services
Term Contract
Design
Fresno, Merced, Oakhurst, Tulare, CA 93703

Portable Toilet Rental Services - Mendota Wildlife Area
Term Contract
Bidding
Sacramento, CA 95811

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Bidding

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

AHU Replacement Fresno Armory
Alteration
Results
$350,000 est. value
Fresno, CA 93727

HVAC Services
Alteration
Results
Oroville, San Joaquin, San Luis Obispo, CA

Janitorial Services
Term Contract
Bidding

Job Order Contract - Mechanical
Alteration
Post-Bid
Clovis, CA

Ahwahnee Middle School Locker Room Heating Replacement
Renovation, Alteration
Results
$200,000 est. value
Fresno, CA 93710

SJH Facilities Maintenance Electrical and HVAC
Term Contract
Bidding
Friant, CA

Portable Toilet Project
Term Contract
Post-Bid
Avenal, Blythe, California City, Calipatria, Camarillo, Chino, Chowchilla, Coalinga, Corcoran, Corona, Delano, Folsom, Galt, Imperial, Ione, Jamestown, Lancaster, Malibu, Norco, Norwalk, Paso Robles, San Diego, San Quentin, Sloughhouse, Soledad, Stockton, Susanville, Tehachapi, Tracy, Vacaville, Warner Springs, Wasco, CA 93204

Edison High School Multipurpose Room HVAC Replacement
Alteration
Results
$200,000 est. value
Fresno, CA 93706

Aynesworth and Calwa Elementary Schools Unit Ventilation, EMS, and Central Plant Equipment Replacement
Alteration
Bidding
Fresno, CA 93725

Energy Management System Upgrade - Various Sites
Alteration
Post-Bid
Clovis, CA

Last Updated 02/11/2022 04:23 AM
Project Title

Energy Management System Upgrade - Various Sites

Physical Address View project details and contacts
City, State (County) Clovis, CA 93619   (Fresno County)
Category(s) Single Trades
Sub-Category(s) HVAC, Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Time of completion date for the project shall be 210 Calendar Days from the notice of proceed date.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents