Similar Projects
Murphy USA #6608 / Stillwater
Demolition, New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Stillwater, OK 74074

Grade, Drain, and Surface - US 177
Infrastructure
Design
$5,088,000 CJ est. value
Stillwater, OK 74074

Grade, Drain, and Surface - US 177
Infrastructure
Design
$5,088,000 CJ est. value
Stillwater, OK 74074

OSU New Central Market Place - Select Trades Rebid
New Construction, Infrastructure
Sub-Bidding
$15,000,000 CJ est. value
Stillwater, OK 74074

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt Repairs for OSUIT-Okmulgee
Infrastructure
Post-Bid
Stillwater, OK

Grade, Drain, and Surface
Infrastructure
Results
OK

Lake McMurtry Nature Learning Trail
Infrastructure
Results
Stillwater, OK

Teal Ridge Estates Second Section
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 51
Infrastructure
Design
$1,000,000 CJ est. value
Stillwater, OK 74074

Asphalt Overlay
Infrastructure
Post-Bid
$2,679,278 CJ est. value
Stillwater, OK 74074

Asphalt Overlay
Infrastructure
Results
Stillwater, OK

Utilities - SH 18
Infrastructure
Design
$500,000 CJ est. value
Yale, OK 74085

South Thompson Avenue, Culvert Replacement Over Cottonwood Creek
Infrastructure
Post-Bid
$300,000 CJ est. value
Cushing, OK 74023

Slabjacking and Subsealing Services
Infrastructure
Results

Last Updated 01/24/2023 07:36 AM
Project Title

Widen and Resurface - SH 51

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74074   (Payne County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $13,390,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-51: Eb From 8.0 Miles East of I-35, Extend East 5.50 Miles (Shouldering and Resurfacing). As of January 24, 2023, the project is in Design status. Anticipated letting month/year is June, 2024. Length : 5.500 Mi OKDOT - Widen and Resurface - SH 51 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents