Similar Projects
Sanitary Sewer Phase 2
Infrastructure
Bidding
$1,000,000 est. value
Assumption, IL

Washington Street Sewer Separation - Phase 1
Infrastructure
Bidding
$400,000 est. value
Villa Park, IL

Dust Collection System Installation
Post-Bid
Grayslake, IL 60030

Litter/Debris Removal from the Edge of the Pavement to the Pedestrian Barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave)
Post-Bid
IL

Sanitary Sewer System Improvements Contract A
Results
Tilton, IL 61833

2021 Sanitary Sewer Rehabilitation
Results
Joliet, IL

47th Street Reconstruction
Infrastructure, Alteration
Bidding
$200,000 est. value
Moline, IL 61265

L6767 Hillsboro Snow Removal
Post-Bid
Springfield, IL

Juniper Road and Beaver Lane Improvements
Results
Glenview, IL

2022 CIPP Sewer Rehabilitation
Infrastructure
Bidding
$800,000 est. value
Normal, IL

Provide Refuse and Recycling Disposal Sites for Southeast Region 4
Post-Bid
Chicago, IL

20-06 South Shores Sewer Rehabilitation
Renovation
Results
Decatur, IL

Waste Disposal and Recycling Services
Alteration
Bidding
Harvard, IL

2021-5 Residential One Day Electronics Collection Bid
Term Contract
Post-Bid
Joliet, IL

2021 Sanitary Manhole Rehabilitation
Results
Elmhurst, IL

Reported 05/11/2022 12:00 AM
Project Title

CentraliaCC-215-Septic Tank Sewage Removal-JWW

Physical Address View project details and contacts
City, State (County) Centralia, IL 62801   (Clinton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Hauling, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors must be able to remove sewage from septic tanks at the facility. There is a total of (5) septic tanks which shall be emptied in the following areas: a. Tower 2 – 500 gallon septic tank b. Tower 3 – 500 gallon septic tank c. Tower 4 – 500 gallon septic tank d. Tower 5 – 500 gallon septic tank e. Firing Range – 1000 gallon septic tank Contractor may offload all sewage at the Sewer Plant under the direction of the Sewer Plant Operator. The Contractor shall ensure the trucks are free of any waste from the outside prior to them servicing our tanks and releasing the sewage in Centralia’s Sewer Plant.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents