Similar Projects
Furnish Bituminous Concrete Driveway Mix
Post-Bid
Acton, MA

Hot Mix Asphalt Recreation Path
Post-Bid
$132,400 est. value
Lincoln, MA

Intersection Improvements and Related Work (Including Culvert Replacement) Boston Road (Route 4) at Concord and Parker Roads
Results
Less than $2,485,443 est. value
Chelmsford, MA 01863

Main Street, Bow Street, Albion Street Sewer Repairs
Results
Less than $425,000 est. value
Medford, MA

Rehabilitate Existing Sewer Collection System
Post-Bid
$500,000 est. value
Tyngsborough, MA

Roadway Reconstruction and Related Work (including Signals) along Sections of Ridge Street and Johnson Road (Safe Routes to School - Vinson-Owen Elementary School)
Results
Less than $1,584,458 est. value
Winchester, MA 01890

Town Hall - Sewer Lateral Line Replacement
Post-Bid
$40,000 est. value
Pepperell, MA

Catch Basin Cleaning
Results
Lexington, MA 02420

Removal of Infiltration and Inflow from Sewer
Post-Bid
Everett, MA

Random Crack Sealing
Results
Less than $88,000 est. value
Woburn, MA

Mill and Fill Road Repairs
Post-Bid
$48,320 est. value
Tewksbury, MA

Tier 3 Complete Streets Improvement
Results
Less than $460,000 est. value
Sherborn, MA 01770

Cold-in-Place Asphalt Recycling
Term Contract
Post-Bid
$250,000 est. value
Hopkinton, MA

Paving Services
Term Contract
Results
Less than $700,000 est. value
Chelmsford, MA

FY21 Stormwater Improvements
Post-Bid
Ayer, MA

Reported 05/11/2022 12:00 AM
Project Title

Guardrail, Pavement Markings, Roadway Management, Bituminous Products, Crack Sealing, Tree Planting, Stormwater Pond Maintenance and Catch Basin Cleaning

Physical Address View project details and contacts
City, State (County) Wilmington, MA   (Middlesex County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Products and services for Fiscal Year 2023 (July 1, 2022 through June 30, 2023) to the Town of Wilmington, MA, 1. Screener Rental; 2. Guardrail; 3. Pavement Markings; 4. Roadway Management Services; 5. Bituminous Products at Plant; 6. Crack Sealing; 7. Tree Planting Services; 8. Stormwater Pond Maintenance Services; 9. Catch Basin Cleaning Services.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents