Similar Projects
Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Mocho Groundwater Demineralization Plant Concentrate Conditioning System Project
Infrastructure
Bidding
$5,000,000 est. value
Pleasanton, CA 94566

Pumping Equipment Repairs
Infrastructure
Bidding
Simi Valley, CA

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Seawater Intrusion Prevention (SWIP) Well Equipping Project
Infrastructure
Bidding
$4,500,000 est. value
Aptos, CA

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

Well Abandonment Project
Infrastructure
Results
Riverside, CA 92519

Clubhouse Shallow Groundwater Supply Test Wells
Infrastructure
Bidding
Imperial, CA

Install Chill Water Pumps
Term Contract
Post-Bid
CA 95652

Drilling of Water Wells North Long Beach 13 and North Long Beach 14
Infrastructure
Results
$4,486,918 est. value
Long Beach, CA 90899

Annual Contract to Rebuild and Repair KSB Influent Pump and Motors
Term Contract
Bidding
Visalia, CA

Last Updated 05/12/2022 02:31 PM
Project Title

127Eaw22r0025 - Stanislaus Multi CG Well Water System

Physical Address View project details and contacts
City, State (County) CA   (Mariposa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract is for the locating, drilling, and development of a new water well, as well as construction of a pump housing and water trough. The work shall also include cleanup and disposal of all removed building material from Forest Service lands

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents