Similar Projects
USCG D/B Install OCS Laundry Room Chase Hall Annex E, USCG Academy
Renovation
Bidding
$100,000 to $250,000 est. value
New London, CT 06320

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

New Readiness Center
New Construction - 42,297 SF
Results
$15,429,000 est. value
Putnam, CT 06260

New Readiness Center
New Construction - 42,297 SF
Results
$15,429,000 est. value
Putnam, CT 06260

TASM-G Building 325 Maintenance Building Renovation
Renovation, Term Contract - 3,500 SF
Post-Bid
$700,000 to $800,000 est. value
Groton, CT 06340

Enfield Armory Kitchen And Latrine Renovation
Renovation
Results
$1,540,102 to $1,621,159 est. value
Enfield, CT 06082

Design-Build/Design-Bid-Build, Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for General Construction Services at PWD NAVSUBASE New London, Connecticut and PWD NS Newport, Rhode Island Area of Responsibility
New Construction
Post-Bid
$500,000 to $5,000,000 est. value
New London, CT

Repair Failing (CI58) Submarine A School Building 488, New London, CT
New Construction - 109,442 SF
Results
$25,000,000 to $100,000,000 est. value
New London, CT

Armory Repairs - Bridge/Drill Shed
Renovation - 1,200 SF
Results
$350,000 to $375,000 est. value
Hartford, CT 06106

Reported 06/06/2020 12:00 AM
Project Title

P-1102 Magazine & Ordnance Operations Facility NAVSUBASE New London CT

Physical Address View project details and contacts
City, State (County) New London, CT   (New London County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

P1102- Magazine & Ordnance Operations Facility constructs a total of twelve magazines (54,279 SF total), one operations building (11,600 SF), and one security office (457 SF). Magazine construction is of earthen covered steel reinforced concrete with steel blast-resistant magazine doors, and will include overhead cranes. Construction includes site preparation, foundations, grounding and lightning protection systems, electrical distribution, area and security lighting, intrusion detection systems, concrete aprons, security fencing, and storm-water controls. Demolition of eighteen existing arch type magazines, one existing operations building and one security building are included in this project. Project will be phased to construct certain new facilities prior to demolition of certain existing facilities.

Details

,, 66,336 SF - 1 Office, 457 SF New Construction, 12 Military Facility, 54,279 SF New Construction, 1 Misc. Buildings, 11,600 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents