Similar Projects
Downtown Sidewalk Replacement
Post-Bid
Manteno, IL

South Schuyler Avenue Bike and Pedestrian Roadway Improvement
Infrastructure
Post-Bid
Kankakee, IL

Parking Lot Improvements
Results
Bourbonnais, IL 60914

Sidewalk Removal & Replacement
Results
Herscher, IL 60941

2021 Parking Lot Replacement at Edison Primary School
Infrastructure
Post-Bid
Kankakee, IL 60901

2020 Curb and Sidewalk Program
Results
Less than $122,530 est. value
Bradley, IL 60915

2020 MFT Maintenance Program
Results
Less than $430,515 est. value
Bradley, IL 60915

Parking Lot Rehabilitation - Je Neir Elementary and Momence High School
Results
Momence, IL 60954

2021 Curb and Sidewalk Program
Results
Bradley, IL

2021 Multi-Use Recreational Path
Results
Manteno, IL

Sidewalk Removal and Replacement
Infrastructure
Results
$12,800 est. value
Aroma Park, IL

Legacy Park North Parking Lot Improvements
Infrastructure
Results
Kankakee, IL

Coyne Street Parking Lot Improvements
Infrastructure
Results
$229,152 est. value
Kankakee, IL

Curb and Driveway Improvements
Infrastructure
Results
$208,124 est. value
Bourbonnais, IL

2021 Parking Lot Maintenance Program
Infrastructure
Results
$62,072 est. value
Bourbonnais, IL

Last Updated 12/01/2021 05:58 PM
Project Title

IVHM FY22 Concrete

Physical Address View project details and contacts
City, State (County) Manteno, IL 60950   (Kankakee County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The procurement is for the repair and installation of concrete ramps, sidewalks and patios at the Illinois Veterans Home Manteno. The Illinois Department of Veterans’ Affairs is seeking bids to install (4) Concrete Patios, (7) Concrete Ramps, (9) Concrete Sidewalks, and (2) Sets of Concrete Stairs. Qualified contractor shall provide all concrete work for the paving. All concrete paving shall have positive storm water drainage and have grades which are within the Illinois Accessibility Code. Contractor shall provide concrete Finishing, curing, and waterproofing. Contractor shall provide all saw cutting and forming joints and expansion joint placement. Also, contractor shall test the concrete mixture and strength. Qualified contractor will be responsible for the removal and offsite disposable of old concrete. BEP goal: 7%

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents