Similar Projects
Heritage Lift Station Upgrade - City of Gillette
Infrastructure
Conception
$2,500,000 CJ est. value
Gillette, WY 82716

Foothills Boulevard Curves/Drainage - 47401 - City of Gillette
Infrastructure
Conception
$2,500,000 CJ est. value
Gillette, WY 82716

7th Street Water Main Replacement Project
Infrastructure
Bidding
$850,000 CJ est. value
Gillette, WY 82716

7th Street Water Main Replacement Project
Infrastructure
Bidding
$850,000 CJ est. value
Gillette, WY 82716

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Road Maintenance
Infrastructure
Post-Bid
Gillette, WY

Milling Plant Mix, Bituminous Pavement Surfacing (Recycle), Fencing and Miscellaneous
Infrastructure
Results
WY

Chip Sealing and Miscellaneous Work
Infrastructure
Results

U-Haul of Gillette
New Construction, Infrastructure - 38,264 SF
Pending Verification
$4,000,000 CJ est. value
Gillette, WY 82718

Warlow Drive Street Improvements Project - 44331 - City of Gillette
Infrastructure
Conception
$2,250,000 CJ est. value
Gillette, WY 82716

Twin Spruce Junior High School Football Field Renovation
Infrastructure
Bidding
$115,000 CJ est. value
Gillette, WY 82716

Annual Trenching and Boring Services
Term Contract
Post-Bid
Gillette, WY

District 4 Logo Signs
Infrastructure
Results
$200,000 est. value
Gillette, WY

Rourke Avenue & Winland Drive Surfacing Project - City of Gillette
Infrastructure
Conception
$1,500,000 CJ est. value
Gillette, WY 82716

Saunders Subdivision Street Improvements
Infrastructure
Bidding
$850,000 CJ est. value
Gillette, WY 82718

Last Updated 02/09/2023 02:15 PM
Project Title

Lakeway Road Pavement Improvements

Physical Address View project details and contacts
City, State (County) Gillette, WY 82718   (Campbell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,520,566 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Remove and replace approximately 975 LF of low flow trickle channel within Sage Bluffs Park running generally north/south along east extents. Along this route, trees will need to be removed and replaced as well as irrigation system removals/relocations. The existing channel will be widened. The field area designated as the "ice rink" will be regraded. Areas of asphalt removal and patching, edge drain removal and installation, storm sewer installation, miscellaneous concrete repairs and water fitting replacement on Lakeway Road between Harder Drive and 4J Road. A 3" asphaltic concrete paving will be completed on approximately 9,665 SY of Lakeway Road. Concrete removal and replacement as well as water fitting replacement will take place at the intersection of Harder Drive and Lakeway Road.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents