Similar Projects
Last Updated | 02/09/2023 02:15 PM |
Project Title | Lakeway Road Pavement Improvements |
Physical Address | View project details and contacts |
City, State (County) | Gillette, WY 82718 (Campbell County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,520,566 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description: Remove and replace approximately 975 LF of low flow trickle channel within Sage Bluffs Park running generally north/south along east extents. Along this route, trees will need to be removed and replaced as well as irrigation system removals/relocations. The existing channel will be widened. The field area designated as the "ice rink" will be regraded. Areas of asphalt removal and patching, edge drain removal and installation, storm sewer installation, miscellaneous concrete repairs and water fitting replacement on Lakeway Road between Harder Drive and 4J Road. A 3" asphaltic concrete paving will be completed on approximately 9,665 SY of Lakeway Road. Concrete removal and replacement as well as water fitting replacement will take place at the intersection of Harder Drive and Lakeway Road. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |