Similar Projects
2021 Brewery Sanitary and Watermain Improvements
New Construction, Infrastructure
Bidding
Cold Spring, MN

Lift Station 7 and 10 Rehabilitation
Renovation
Bidding
Shorewood, MN

Lift Station Maintenance and Repair Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

DNR2 RFB Brainerd Office Replacement Lift Pumps
Renovation
Post-Bid
Brainerd, MN 56401

Wood Lake Lift Station Improvements
Results
$625,000 est. value
Richfield, MN

Ridgedale Booster Station Improvements
Results
$450,000 est. value
Minnetonka, MN 55345

Grein Residential Development Phase 1
New Construction, Infrastructure
Bidding
Lakefield, MN

2021 Sanitary Lift Station No. 33 and No. 34 Improvements
Renovation
Post-Bid
$532,065 est. value
Moorhead, MN

Williston Road Lift Station Rehabilitation
Results
$1,950,000 est. value
Minnetonka, MN

Lift Station No. 14 Reconstruction
New Construction
Bidding
Baxter, MN

Lift Station 1
New Construction
Post-Bid
$709,900 est. value
Lilydale, MN

DNR4 Gilfillan Lake WMA Pump Control Replacement
Renovation
Results
$35,000 est. value
MN

Lift Station and Forcemain Improvements
Renovation, Infrastructure
Bidding
Stewart, MN

Lift Station - 11 Improvements
Renovation
Post-Bid
$750,000 to $800,000 est. value
Andover, MN

Storm Lift Station Improvements
Results
$735,000 est. value
Eagan, MN

Last Updated 07/05/2021 05:26 AM
Project Title

Bluebill and Crystal Lake Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Burnsville, MN   (Dakota County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the making of the following described local improvements, said proposal for the furnishing of all labor and materials for the construction, which is described as follows: 1. Removal of the existing lift stations equipment and piping at Bluebill and Crystal Lake. 2. Furnish and install new pumps, piping, fitting, valves, and all appurtenances in the Wet Well and valve Vault. At Bluebill, reuse the existing valves. 3. Furnish and install new control panel and lift station controls. 4. Coat/paint the wet well, valve vault, and the interior piping and valves in each station. 5. Core drill a drain line from the valve vault to the wet well without excavating. 6. Increase the valve vault lid elevation at the Crystal Lake lift station to match the lid elevation of the wet well.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents