Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$6,034,000 CJ est. value
Watertown, SD 57201

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$6,034,000 CJ est. value
Watertown, SD 57201

Polymer Chip Seal
Infrastructure
Design
$283,000 CJ est. value
Watertown, SD 57201

Polymer Chip Seal
Infrastructure
Design
$283,000 CJ est. value
Watertown, SD 57201

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

New City Hall - Watertown City Hall
New Construction, Infrastructure
Post-Bid
$1,700,000 CJ est. value
Watertown, SD 57201

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Urban Grading (23K CuYd), PCC Surfacing (42K SqYd), Curb and Gutter, ADA, Lighting
Infrastructure
Results
SD

Village at Harmony Park
New Construction, Renovation, Infrastructure
Construction
Watertown, SD 57201

Ice Arena - Bid Pack No. 2
New Construction, Infrastructure
Construction
$787,000 CJ est. value
Watertown, SD 57201

2022 Water System Improvements - Sioux Rural Water Systems
Infrastructure
Conception
$5,081,000 CJ est. value
Watertown, SD 57201

3rd Avenue Northwest Roadway Improvements
New Construction, Infrastructure
Post-Bid
Watertown, SD 57201

Asphalt Patching Material
Term Contract
Results
Watertown, SD

AC Surfacing
Infrastructure
Conception
$3,262,000 CJ est. value
Henry, SD 57243

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Last Updated 03/29/2023 07:31 AM
Project Title

Grading, Interim Surfacing

Physical Address View project details and contacts
City, State (County) Henry, SD 57243   (Codington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $13,850,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD25 - Fm 9 N of US212 to the Clark/Day Co Line. As of March 29, 2023, the project is in Conceptual status. Anticipated Construction year is 2025. SDDOT - Grading, Interim Surfacing *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents