Similar Projects
Locating Subsurface Facilities
Alteration
Bidding
Riverside, CA 92519

Storm Drain System Improvement
Infrastructure
Bidding
$7,946,443 est. value
San Jose, CA 95134

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Storm Water Pump Repair Services In San Mateo and Santa Clara Counties
Term Contract
Post-Bid

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Construct Storm Water Treatment Devices and Imported Borrow
Infrastructure
Bidding
$4,900,000 est. value
CA

PW Various Locations Pavement Renovation No 45 and Sewer Replacement
Infrastructure, Alteration
Post-Bid
$6,300,000 est. value
San Francisco, CA 94103

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Storm Water Pumps and Other Related Plumbing Plant Services
Term Contract
Bidding
CA

Storm Water Pumps and other Related Plumbing Plant Services in Orange County
Term Contract
Post-Bid
CA

Gold Flat Campground Upgrades
Renovation
Results
$700,000 to $1,100,000 est. value
Oroville, CA 95966

Sewer Main Relining
Alteration
Bidding
$125,000 est. value
Fallbrook, CA

Wastewater, Water, And Landfill Systems Consulting Services
Infrastructure
Post-Bid
CA

WRCRWA Anaerobic Digester #3
Infrastructure
Results
$4,800,000 est. value
Corona, CA 92880

Last Updated 11/01/2021 10:19 AM
Project Title

Park Way CSS Improvement Project

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95811   (Sacramento County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $95,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Services: These Special Provisions cover in general, the reconstruction of combined sanitary sewer facilities on Park Way (33rd to 35th Streets) and 33rd Street (Just south of Park Way). The work to be performed consists of installing backflow prevention flap valves on nine (9) drain inlets along Park Way and 33rd Street and sealing five (5) manholes along the same alignment. The Contractor shall provide all labor, materials, tools and equipment, and shall perform all work necessary to complete the subject project in place and make all required connections to the existing combined sewer system as shown on the Plans and as specified herein.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents