Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

South Lake Union the Mercer Blocks
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Seattle, WA 98109

San Souci Road Elevation Design
Infrastructure
Design
WA

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

12th Avenue South Multi Residential Development
LEED Certification, New Construction, Infrastructure - 3,800 SF
Pending Verification
$54,700,000 CJ est. value
Seattle, WA 98122

Last Updated 11/11/2022 05:07 AM
Project Title

SR 900 / 68th Ave S Vicinity - Pedestrian Safety - Phase 2

Physical Address View project details and contacts
City, State (County) Bryn Mawr-Skyway, WA 98178   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $704,590 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing cement sidewalk curb and ramp, replacing existing storm drain system, updating pedestrian push button, removing and replacing guardrail, removing pavement markings, temporary erosion control, traffic control and other work. Estimated value $600,000 - $750,000 County: King County WSDOT - SR 900 / 68th Ave S Vicinity - Pedestrian Safety - Phase 2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Contract provides for the improvement of *** SR 900 in King County, MP 8.17 to MP 8.33, 68TH AVE S VICINITY; PEDESTRIAN SAFETY - PHASE 2, by constructing cement concrete sidewalk and curb ramp, replacing existing storm drain system, updating pedestrian push button, removing and replacing guardrail, removing pavement markings, temporary erosion control, temporary traffic control and other work

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents