Similar Projects
New Parking Lot and Elevated Parking Deck Adjacent to City Hall
Post-Bid
Saint George, UT 84770

The Inn Between Cement Walkway
Post-Bid
Salt Lake City, UT 84105

1700 South, 600 East Bike Lane, School Crosswalk Enhancements
Results
Less than $84,895 est. value
Salt Lake City, UT 84111

Historic Utah Southern Rail Trail - via UPRR, Lehi Metropolitan Planning Organization
Results
$500,000 to $1,500,000 est. value
UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Parking Lot Seal and Coat, Paint
Results
Logan, UT 84341

2020 Provo City Sidewalk Replacement Project
Post-Bid
Provo, UT

Holladay Safe Routes to School Safe Routes to Schools/Pedestrian/Bicycle Safety
Results
Less than $500,000 est. value
UT

Construction of the Santa Clara Lava Flow Trail
Post-Bid
Santa Clara, UT 84765

Mesa Drive Sidewalk
Results
$170,000 to $225,000 est. value
Salt Lake City, UT 84190

Asphalt Preservation in Parking Lots for Senior Center
Post-Bid
Price, UT 84501

SR-85; MP 3.52-20.84, Various Improvements HSIP - Highway Safety Improvement/Intersection Improvement
Results
$1,500,000 to $3,000,000 est. value
UT

Asphalt Preservation in Parking Lots for RC Airport
Post-Bid
Price, UT 84501

The Red Fleet Flow Trail Project
Results
Maeser, UT 84078

Asphalt Preservation in Parking Lots for Intake Building
Post-Bid
Price, UT 84501

Last Updated 01/09/2020 01:48 PM
Project Title

Elton Park Sidewalk Project

Physical Address View project details and contacts
City, State (County) Tooele, UT 84074   (Tooele County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $60,000
Plans Available from Municipal Agency - 10/15/19
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 930 linear feet of 6-foot wide integral sidewalk, 50 linear feet of 5-foot wide sidewalk, and 400 linear feet of 4 foot wide park strip as part of the Modified Elton Park Sidewalk Project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents