Similar Projects
Waste Water Lift Station Pump and Grinder Replacement
Renovation
Bidding
Black Hawk, CO 80422

Piney Creek Lift Station Upgrades
Renovation
Bidding
$2,500,000 to $2,700,000 est. value
Aurora, CO 80016

Murphy Creek Lift Station Wetwell Recoating
Post-Bid
Aurora, CO

Zone 3/4 Pump Station MCC Replacement and VFD Install
Renovation
Post-Bid
Thornton, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Lift Station Valve Assembly Construction
Results
Less than $122,000 est. value
Falcon, CO

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

Whitewater Lift Station Rehabilitation Project
Renovation
Bidding
CO

High Head Pump Station/Low Head Pump Station MCC Replacement Project
Renovation
Post-Bid
Canon City, CO

Sunset Mesa Water Tank and Pump Station Project
Results
Less than $4,000,000 est. value
Montrose, CO

Bell Roth Pump Station Electric Service Upgrade
Renovation
Bidding
CO

Lift Station Improvements
New Construction
Post-Bid
Crested Butte, CO

Eccv Office Expansion
Renovation
Results
Less than $2,000,000 est. value
Aurora, CO 80016

Siena Pump Station and Pipeline
Infrastructure
Bidding
CO

Non-Potable Irrigation Pump Stations for Water and Sewer Department
New Construction
Post-Bid
Greeley, CO 80631

Reported 01/22/2022 12:00 AM
Project Title

High Zone NP Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Erie, CO   (Boulder County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 12/17/21
Owner View project details and contacts
Architect View project details and contacts
Description

The High Zone NP Pump Station Improvements project, which includes: installation and start-up of three (3) vertical turbine pumps, interior non-potable pipework, pouring concrete pump pedestals, installing electrical conduit and wiring, adding controls for pump operation, demolishing and paving existing gravel walk, installing a semi perimeter footing drain, installing a drainage system for local drainage conveyance, and local grading of vegetated areas on the east perimeter of the pump house.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents