Similar Projects
Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

The Flats at Forest Park
New Construction, Infrastructure, Alteration
Design
$35,000,000 est. value
Saint Louis, MO 63115

The Flats at Forest Park
New Construction, Infrastructure, Alteration
Design
$35,000,000 est. value
Saint Louis, MO 63115

Construction of the Access Control Points in support of the National Geospatial-Intelligence Agency
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Saint Louis, MO 63107

Construction of the Access Control Points in support of the National Geospatial-Intelligence Agency
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Saint Louis, MO 63107

Preservation Square Phase 2A - Site Prep Package
Renovation
Post-Bid
Saint Louis, MO 63106

Preservation Square Phase 2B - Site Prep Package
Infrastructure
Post-Bid
Saint Louis, MO 63106

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

Katie's Pizza & Pasta Osteria - Ballpark Village / St. Louis
New Construction, Infrastructure - 10,000 SF
Construction
$3,000,000 CJ est. value
Saint Louis, MO 63102

Lux Living South Kingshighway Boulevard Multi Residential
New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Lux Living South Kingshighway Boulevard Multi Residential
New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

O'Fallon Park - City of St. Louis
Infrastructure
Conception
$1,019,234 CJ est. value
Saint Louis, MO 63147

Gateway South Redevelopment
New Construction, Infrastructure
Design
$1,200,000,000 CJ est. value
Saint Louis, MO 63102

Last Updated 09/30/2022 02:07 PM
Project Title

I-70 Improvements from Wentzville Parkway to Route Z - Missouri Department of Transportation

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63102   (Saint Louis City County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $38,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The goal of the project is to improve the capacity, safety, and reliability of I-70 between Wentzville Parkway and I-64. The project will shift I-70 to the southwest, add lanes and replace the existing Norfolk Southern Railroad (NSRR) bridge over I-70. The existing bridges over Route Z/Church Street will also be widened as part of this project. As of September 30, 2022, the preliminary design phase is complete. An engineer has been selected. The Right of Way Acquisition is in progress as is the Final Roadway and Bridge Design. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is expected to begin in the fall of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents