Similar Projects
Hillon Hood Road - Gas Improvements
Infrastructure
Post-Bid
LA

Phase 3: Rehabilitation of Texas Street Elevated Water Tank
Infrastructure
Results
LA

6" PE Extension of Natural Gas Facilities to Serve the Bluffs on Thompson Creek and Surroundings Areas
Infrastructure
Post-Bid
Saint Francisville, LA

Aviation Fuel System Rehabilitation
Infrastructure
Bidding
$240,500 est. value
Gonzales, LA 70737

Aviation Fuel System Improvments
Infrastructure
Post-Bid
$291,000 est. value
LA

Remove, Furnish and Install Fuel Pumps for KPD
Infrastructure
Bidding
Kenner, LA 70062

Gas Line Repair - DOC
Infrastructure
Bidding
Angola, LA 70712

Gas Service to Greenwood Park and Baton Rouge Zoo project
Infrastructure
Results
$670,000 est. value
Baker, LA

Reported 12/22/2021 12:00 AM
Project Title

Replacement of Natural Gas Distribution Facilities along LA Highway 421 and Phase 3 within the Lake Rosemound Area

Physical Address View project details and contacts
City, State (County) LA   (West Feliciana County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $525,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For installing approximately 25,050 linear feet of 4” PE coiled pipe for the purposes of replacing the existing PVC gas distribution system mains and services along La 421 and N. Lake Rosemound Road. The project also requires the replacement of service pipe totaling approximately 800 linear feet of 1” PE pipe. Included in the new gas distribution system is the installation of 4” PE ball valves, necessary road bores and tie-ins to the existing 4” gas mains at each end of the replacement. The project also requires service taps and the transfer of approximately 21 existing customers to the new main. The contractor will be asked to trench the gas main as marked on the plans to allow installation of detector tape and separation of the tracer wire from the main.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents