Similar Projects
Ontario Place
New Construction, Infrastructure - 33,600 SF
Conception
$5,800,000 CJ est. value
Olympia, WA 98501

Forest Park 2
New Construction, Infrastructure
Conception
$22,600,000 CJ est. value
Tumwater, WA 98512

New Police Station - City of Lacey
Demolition, New Construction, Infrastructure
Design
$38,000,000 CJ est. value
Lacey, WA 98503

SR 507/N of Connor Rd - Culvert Replacement
Infrastructure
Design
$123,000 CJ est. value
Rainier, WA 98576

Thurston Public Utilities District (PUD) Water Reservoir and Booster Station
Infrastructure
Bidding
$900,000 CJ est. value
Lacey, WA 98503

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

SouthWest Mosman Avenue Phase Two
Infrastructure
Results
$1,150,000 to $1,270,000 est. value
Yelm, WA 98597

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

FSCSS Olympia Affordable Apartment Phase 2
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Olympia, WA 98502

FSCSS Olympia Affordable Apartment Phase 2
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Olympia, WA 98502

Pilot Travel Center / Tumwater
Addition, Infrastructure, Build-out - 1,100 SF
Pending Verification
$400,000 CJ est. value
Tumwater, WA 98512

Pilot Travel Center / Tumwater
Addition, Infrastructure, Build-out - 1,100 SF
Pending Verification
$400,000 CJ est. value
Tumwater, WA 98512

US 101/Black Lake Blvd Bridge - Special Repair
Infrastructure, Renovation
Conception
$316,000 CJ est. value
Tenino, WA 98589

New Office Building M&T Advanced Properties
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Olympia, WA 98501

Last Updated 03/29/2023 06:07 PM
Project Title

Intercity Transit Pattison - South Parcel Expansion Project - Bid Stage 1

Physical Address View project details and contacts
City, State (County) Olympia, WA 98506   (Thurston County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Misc. Structures, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Stage I Bidding BP 2.0 Demolition and Abatement (Site) BP 31.0 Earthwork and Utilities BP 32.0 Asphalt Paving BP 32.2 Landscape and Irrigation BP 32.3 Site Fencing Demolition of the existing administration building, construction of a permanent storage metal structure, renovation of the existing maintenance building and surrounding site work/ civil upgrades. Phase 1 Underground Electrical and Mechanical infrastructure. Phase 2 will be demolishing the existing Administration building in preparation for a newly paved employee parking lot, constructing two new infiltration galleries, and installing a gravity retaining wall at the grade change between the new parking lot and existing entrance. Direct all Questions to: Alex Chicano, Project Manager via email AlexC@formacc.com All bids shall remain valid for a period of sixty (60) calendar days, alternates for ninety (90) calendar days. In accordance with RCW 39.04.320 the state of Washington requires 15% apprenticeship participation. The owner reserves the right to accept or reject any or all proposals and to waive informalities

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents