Similar Projects
Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Paloma Wash Pedestrian Bridge Professional Design Services
Alteration
Post-Bid
Menifee, CA

Airport Misc. Stormwater Concrete Improvements
Infrastructure, Alteration
Results
$35,000 est. value
Palm Springs, CA 92262

Provide and Install Roller Shades at Monte Vista Middle School
Renovation
Results
$177,725 CJ est. value
San Jacinto, CA 92582

Install Rock Slope Protection, Irrigation, Planting, and Access Road
Infrastructure
Post-Bid
$1,700,000 CJ est. value
Riverside, CA 92505

James Street Sewer Extension Project
Infrastructure
Results
$409,310 CJ est. value
Corona, CA 92881

RFQ Construction Manager - New Potable Water Wells at Chuckawalla Valley State Prison
Infrastructure
Post-Bid
$1,060,000 CJ est. value
Blythe, CA 92225

South Recreation Mall - Phase I
Infrastructure
Results
$1,152,000 CJ est. value
Riverside, CA 92521

Julian Hinds Pumping Plant Village Paving
Infrastructure
Post-Bid
$210,000 CJ est. value
Desert Center, CA 92239

Valle Vista Library Parking Lot Paving
Infrastructure
Results
$4,747,035 CJ est. value
Hemet, CA 92544

Asphaltic Concrete Cold Planning Services
Infrastructure
Post-Bid
$200,000 CJ est. value
Riverside, CA 92518

Sundance-Corta Bella Communities Curb Ramp Ada Upgrade Project
Infrastructure
Results
$562,530 CJ est. value
Indio, CA 92201

Mccallum Theatre Asphalt Replacement RE-BID
Infrastructure, Renovation
Post-Bid
$1,200,000 CJ est. value
Palm Desert, CA 92260

Damaged Concrete Removal and Replacement at Fire Stations 7 and 8
Renovation
Results
$79,189 CJ est. value
Riverside, CA 92522

Vietnam Veterans Memorial Project
Infrastructure
Post-Bid
$40,000 CJ est. value
Murrieta, CA 92562

Last Updated 05/02/2023 09:33 AM
Project Title

Rustin Avenue Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Riverside, CA 92522   (Riverside County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $158,258 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 13, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The project entails new sidewalk improvements on Rustin Avenue between 1928 Rustin Avenue and Spruce Street. The project improvements include, but are not limited to; tree and shrub removal; construction of concrete sidewalk, pedestrian ramps, retaining curb, bus stop pad and shelter; installation of traffic signing and striping. Online Q&A Yes Q&A Deadline 03/20/2023 3:00 PM (PDT)

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents