Similar Projects
Road and Stormwater Maintenance and Repair Services
Infrastructure
Bidding
Brookhaven, GA

KSU - Stormwater Structure Maintenance and Inspection Services
Infrastructure
Bidding
Kennesaw, GA 30144

Construct and Repair Outfall 9 Culvert at Poorhouse Creek and Windy Hill Road
Post-Bid
Marietta, GA 30069

Storm Drainage and Street Improvements Phase III
Post-Bid
Bronwood, GA

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

Fairways Drive Stormwater Improvement Project
Results
Douglasville, GA 30134

Stormwater Design for Georgia Avenue
Infrastructure
Bidding
Hampton, GA 30228

Sewer System Evaluation Surveys
Post-Bid
Lake City, GA 30260

821 Tanglewood Trail Stormwater Improvement
Results
Sandy Springs, GA

Stormwater Utility On-Call Contractors
Term Contract
Bidding
$1,000,000 to $4,000,000 est. value
Duluth, GA

On-Call Stormwater Infrastructure Response Installation and Repair Services
Term Contract
Post-Bid
Chamblee, GA 30341

4934 Peachtree Dunwoody Stormwater System Improvement
Results
Less than $38,538 est. value
Sandy Springs, GA 30328

Downey Street Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

Mark Lane Stormwater Improvement Project
Results
Less than $107,000 est. value
Douglasville, GA 30134

Born Street Storm Drain Connect to Existing System Project
Post-Bid
Lawrenceville, GA 30046

Last Updated 12/22/2021 12:51 AM
Project Title

Southbridge Golf Course Storm Pipe Replacement

Physical Address View project details and contacts
City, State (County) GA   (Chatham County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: In coordination with golf course management, access the work area along the approximate route shown on the sketch posted with the bid document. Minimize impacts to golf course area. Construct cofferdam or other dewatering mechanism at end of existing pipe. Existing pipe is some 8'-10' deep at this end, reducing to 5' at the other end. Existing trees shall remain unless removal is directed by the County. Remove existing storm drain pipe. Golf hole will be closed to play during period of removal/replacement/re storation. Install new 24" HDPE pipe. Replace concrete cart path. Remove cofferdam/dewatering device. Sod area of crossing with grass to match existing. Work back out from crossing area, restoring damaged areas along the way. Sod areas of course damaged.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents