Similar Projects
E Avenue North East from 19th Street to 20th Street
Conception
$1,650,000 est. value
Cedar Rapids, IA 52402

15th Avenue South West from 4th Street to C Street
Conception
$1,707,000 est. value
Cedar Rapids, IA 52404

Hawkeye Road Water Main Extension
Infrastructure
Bidding
$442,700 est. value
Jesup, IA 50648

2022 Water Main Improvements
Infrastructure
Bidding
$4,228,000 est. value
Stuart, IA

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

Water System Improvements
Term Contract
Post-Bid
Storm Lake, IA 50588

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

2022 SouthWest Water Main Loop
Infrastructure
Bidding
$350,000 est. value
Urbana, IA

Water System Improvements - Well 1
Infrastructure
Post-Bid
Wahpeton, IA 51360

2021-22 Water Main Improvements
Results
$4,473,470 est. value
Bedford, IA

6 Inch Lambs Grove Water Main Replacement
Infrastructure
Bidding
$500,000 est. value
Newton, IA

Fire Hydrant Cleaning/Painting Project
Infrastructure, Alteration
Post-Bid
Sioux City, IA

Prairie City Water System Improvements - Phase 1
Infrastructure
Results
$1,080,000 est. value
Prairie City, IA

Construction of Highway 17 Utilities Extension
Infrastructure
Bidding
$500,000 est. value
Granger, IA 50109

Last Updated 05/26/2022 12:21 AM
Project Title

2022 North Water Quality Project

Physical Address View project details and contacts
City, State (County) Spencer, IA   (Clay County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of constructing: Section I (ILCC BioretentionCells): Section I is located in the western portion of the Iowa Lakes Community College parking lot at 1900 North Grand Avenue. Improvements include the construction of 6800 square feet of Bioretention Cells designed to improve water quality and control storm water runoff. Said project also includes storm sewer pipe and structures, pavement removal and PCC curb & gutter. Section II (QRS Grass Swales): Section II is located in the southeastern portion of the Quality Refrigerated Services, Inc. lot at 225 West 21 st Street. Improvements include the construction of Sediment Forebays and 310 linear feet of Grass Swales designed to improve water quality and control storm water runoff. Said project also includes storm sewer pipe and structures SECTION I - ILCC Bioretention Cell Excavation 865 Cu. Yd. Storm Water Intakes 5 Each 6" to 10" PE Drain Tile 681 Ln. Ft. 1" Rock Underdrain Layer 305 Ton Native Plants (Species Varies) 1,876 Plants SECTION II - QRS Unclassified Excavation 1,151 Cu. Yd. Approved Topsoil 513 Cu. Yd. Erosion Stone 234 Ton Seeding 277 Square

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents