Similar Projects
2400 Columbia Pike Mixed Use Development
New Construction - 131,083 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Arlington, VA 22204

2400 Columbia Pike Mixed Use Development
New Construction - 131,083 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Arlington, VA 22204

Virginia Hospital Center Expansion
New Construction, Renovation, Addition - 260,000 SF
Design
$250,000,000 to $300,000,000 est. value
Arlington, VA 22205

Crystal Houses III
New Construction - 31,000 SF
Design
Arlington, VA 22202

Walmart 0-1--Moneycenbid--Region #1
Renovation
Post-Bid
$5,250 est. value

L'Occitane en Provence #010
Renovation - 460 SF
Post-Bid
Arlington, VA 22202

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

Gunston Park Diamond Field Replacement
Results
$1,803,000 est. value
Arlington, VA

Clarendon West - East Phase
New Construction, Demolition
Construction
$10,000,000 CJ est. value
Arlington, VA 22201

750 North Glebe
New Construction, Demolition - 498,185 SF
Construction
$140,000,000 est. value
Arlington, VA 22203

GMU Expansion - Institute for Digital Innovation
New Construction - 400,000 SF
Pending Verification
$10,000,000 CJ est. value
Arlington, VA

Potomac Yard Mixed Use
New Construction - 10,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Arlington, VA

Senior Living, Multifamily Towers
New Construction, Build-Out - 850,000 SF
Conception
$10,000,000 CJ est. value
Arlington, VA

Hotel and Residential Tower
New Construction, Demolition - 179,342 SF
Design
$10,000,000 CJ est. value
Arlington, VA 22209

Morphe #32
Renovation - 4,508 SF
Post-Bid
Arlington, VA 22202

Last Updated 10/07/2019 04:06 PM
Project Title

Village Center At Columbia Pike

Physical Address View project details and contacts
City, State (County) Arlington, VA   (Arlington County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Park/Playground, Parking Garage, Retail
Contracting Method
Project Status Construction Commenced fourth quarter 2017, Construction Complete as of October 2019
Bids Due View project details and contacts
Estimated Value $80,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Includes two levels of below grade parking and 5 levels of apartments.
Details ,, 103,530 SF - Retail, 81,530 SF Build-Out, 1 Apartments/Condominiums, 6 Stories Above Grade, New Construction 350 Unit(s), Parking Garage, 2 Stories Below Grade, New Construction, Park/Playground, 22,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents