Similar Projects
J Fred Johnson Park - GP2602 - City of Kingsport
Infrastructure
Conception
$1,000,000 CJ est. value
Kingsport, TN 37664

Senior Center Parking Lot - GP2428 - City of Kingsport
Infrastructure
Conception
$275,000 CJ est. value
Kingsport, TN 37660

West Ridge High School Team Room Building
New Construction, Infrastructure
Design
$770,000 CJ est. value
Blountville, TN 37617

New Fire Station No. 2 - City of Kingsport
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Kingsport, TN 37663

RFQ D/B - Construction of a New Ammonium Nitrate Solution (ANSol) Tank Farm Facility at Holston Army Ammunition Plant (HSAAP)
New Construction, Infrastructure
Bidding
$250,000,000 CJ est. value
Kingsport, TN 37660

Sullivan Heights Middle School Paving Project
Infrastructure
Bidding
$230,000 CJ est. value
Kingsport, TN 37664

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Exterior Site Improvements Rice Terrace, Johnson Court and Mosby Homes
Infrastructure, Renovation
Post-Bid
$711,000 CJ est. value
Bristol, TN 37620

Site Improvements for Civic Auditorium
Infrastructure
Results
$770,000 est. value
Kingsport, TN 37664

2022 Contracted Paving Area 28A
Infrastructure
Results
$829,725 CJ est. value
Kingsport, TN 37660

O'Reilly Auto Parts (BT2) #6628 / Bristol
New Construction, Infrastructure - 7,228 SF
Construction
$1,300,000 CJ est. value
Blountville, TN 37617

Rehabilitation 115 Delaney Street
Infrastructure
Construction
$44,400 CJ est. value
Bristol, TN 37620

Ammonium Nitrate Solution Thermal Destruction Facility at Holston Army Ammunition Plant
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingsport, TN 37660

Eastman / ACCOYA Wood Production Facility
New Construction, Infrastructure
Pending Verification
$136,000,000 CJ est. value
Kingsport, TN 37660

Cattails - Renovations and Equipment - CG2400 - City of Kingsport
Renovation, Infrastructure
Conception
$1,154,000 CJ est. value
Kingsport, TN 37660

Last Updated 09/19/2023 12:06 PM
Project Title

RFP Water Valve Condition Assessment Program

Physical Address View project details and contacts
City, State (County) Kingsport, TN 37660   (Sullivan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid rejected, plan to rebid not timeline at this time. The final Scope of Work may be modified and will become a part of any contract or agreement between the City and the selected Firm. 2. Valve Exercising & Data Collection - Using Owner records, field locate all mainline isolation valves. Collect a coordinate point and detailed asset information including but not limited to: operation type, depth to operating nut, turns to operate, position found, operable, surrounding cover, casting shape, direction to close, and other observations. All valves in the program shall be operated until moving freely at minimum two full cycles. Operations of the valves shall comply with AWWA M-44 Manual of Practice. Valves not to be part of the program include: check valves, altitud valves, pressure reducing valves, air release valves, hydrant isolation valves, blow valves, service isolation valves, and valves within the Kingsport Water Treatment 3. Data Management - The data collected will be formatted such that it shall be easily integrated into Cartegraph OMS either directly or through the Owners enterprise geodatabase. 4. Project Management - The Firm shall coordinate the work and provide regular updates to the Owner regarding schedule, progress, deliverables, broken or frozen valves, and other repair recommendations as identified. 5. Schedule of Costs - provide schedule of costs for all activities to be included in the scope of work with an estimated total for completion based on 20,000 valves. A bid bond or certified check in an amount equal to five percent (5%) of the total of the bid is required. Certified hecks should be made payable to City Treasurer, City of Kingsport. The successful bidder will be required to execute acceptable Performance and Payment Bonds in an amount equal to one hundred (100%) percent of the contract price.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents