Similar Projects
Refurbish Flare No. 3 at the Franklin County Sanitary Landfill
Results
Grove City, OH 43123

2020 Landfill Gas Collection and Control System Construction
Results
Grove City, OH

Phase H5B Cell Construction
Results
Grove City, OH

Defiance County Solid Waste Sanitary Landfill Phase 5 Bat Cell
Results
Less than $1,610,208 est. value
Defiance, OH

Fayette County Construction and Demolition Debris Landfill Capping Project
Results
Less than $250,000 est. value
Washington CH, OH 43160

2020 Facility 3 Cell 1 Improvements Project
Results
Less than $644,429 est. value
Oregon, OH 43616

DEV-Code Landfill Services
Results
Columbus, OH

Defiance County Solid Waste Sanitary Landfill Phase 6 Bat Cell
Post-Bid
OH

2021 Landfill Gas Collection and Control System Construction
Bidding
$51,000,000 est. value
Grove City, OH

Cantilever Gate and Operator at Hoffman Landfill
Results
Toledo, OH 43611

Hancock County Sanitary Landfill Phase I Cell and Support Structures Construction
Post-Bid
Findlay, OH 45840

DEV-Code Landfill 3
Results
Columbus, OH

DEV-Code Landfill Services 2
Post-Bid
Columbus, OH

Qualified Vendors to Provide Leachate System Services
Term Contract
Post-Bid
Grove City, OH 43123

Last Updated 03/26/2020 03:27 PM
Project Title

2020 Final Cover Construction Project

Physical Address View project details and contacts
City, State (County) OH   (Wood County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $274,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Commissioners (Owners) are accepting bids from geosynthetic installers for the following scope of work proposed to be performed as part of the 2020 Final Cap Construction Project: the installation of the 40-mil linear low density polyethylene (LLDPE) textured liner and non-woven geotextile fabric for an approximate 5.5 acre project area. The timing of the 40-mil LLDPE geomembrane and geotextile blanket installations are subject to the preparation and approved completion of the underlying layers (as completed by the Owner), and may therefore require the Contractor to complete his work in multiple phases.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents