Similar Projects
Buildings N, P and C Air Tempering - GPC
Alteration
Bidding
$1,275,400 est. value
Mauston, WI 53948

HVAC System Upgrade Phase 1
Alteration
Bidding
Milwaukee, WI 53216

Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI

Ionization System Installation
Post-Bid
Lancaster, WI 53813

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

HVAC Upgrade
Results
Less than $225,000 est. value
Madison, WI 53593

Building One Air Conditioning Installation
Alteration
Bidding
$283,000 est. value
Madison, WI 53704

HVAC, Hot Water Heaters & Refrigerators
Term Contract
Post-Bid

Replacement of Furnaces
Results
$25,000 to $100,000 est. value
Fountain City, WI 54629

Stairwell Pressurization MEP
Alteration
Bidding
Madison, WI 53706

Emergency Furnace Replacements
Term Contract
Post-Bid
Wisconsin Dells, WI 53965

Kitchen Hood Replacement - MEP
Results
Less than $674,000 est. value
Menomonie, WI 54751

Stairwell Pressurization GPC
Alteration
Bidding
$987,000 est. value
Madison, WI 53706

HVAC Hot Water Heaters and Refrigerators Installment
Term Contract
Post-Bid

Kitchen Hood Replacement - General
Results
Less than $674,000 est. value
Menomonie, WI 54751

Last Updated 07/02/2021 02:50 PM
Project Title

Buildings N, P and C Air Tempering - MEP

Physical Address View project details and contacts
City, State (County) Mauston, WI 53948   (Juneau County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,275,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of the installation of rooftop DX condensing units and necessary structural supports on individual buildings and the installation of DX cooling coils within the existing air handling units serving Buildings “N”, “P”, and the gym of “C”. The existing electrical power supply will be modified to provide power to the new DX condensing units. All new equipment to be controlled by a direct digital control (DDC) system. Each of the modified air handling system will be converted from constant volume to a variable air volume (VAV) type system, with a VAV damper terminal installed at each existing reheat coil, replacement of the existing variable frequency drives, and updated temperature controls.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents