Similar Projects
Central School Addition and Renovations
Renovation, Addition
Bidding
Lemont, IL

Fall Protection Anchorages & Suspended Scaffolding Systems Services
Term Contract
Post-Bid
Chicago, IL 60602

Sheet Metal Supplies
Post-Bid
IL

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

McHenry High School West Campus Addition and Renovations
Renovation, Addition - 64,000 SF
Results
Less than $44,000,000 est. value
McHenry, IL 60050

High School Gym Replacement at Argenta-Oreana High School
Addition - 16,187 SF
Construction
Less than $4,200,000 est. value
Argenta, IL 62501

Various Repair Clamps
Post-Bid
Benton, IL 62812

Fire Station No. 2 Exterior Improvements And Roof Replacement
Renovation
Results
Springfield, IL 62701

North High School Master Facility Plan
Post-Bid
Downers Grove, IL 60515

Accessibility and Miscellaneous Work at Mille Proegler School
Results
Kankakee, IL 60901

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

East Building Addition Phase II - Fitness Addition
Addition
Results
Lincolnshire, IL 60069

Fitness Addition - East Building Addition Phase II
Addition - 89,000 SF
Post-Bid
Lincolnshire, IL 60069

Downers Grove South High School Bid Group #11
Results
Downers Grove, IL 60516

Summer 2021 Improvements at Palombi MS
Post-Bid
Lake Villa, IL

Last Updated 08/04/2021 05:06 PM
Project Title

Fieldcrest East Middle School 2021 Building Improvements

Physical Address View project details and contacts
City, State (County) Wenona, IL 61377   (Marshall County)
Category(s) Education, Single Trades
Sub-Category(s) Middle/Senior High School, Steel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The bid package included as follows: BP 16- Miscellaneous Structural Steel (Furnish and install). Project consists of renovation and health/life safety improvements throughout the existing building. Renovations and improvements include: Mis. Steel at RTU's and Mis. Steel infills at bathroom floors.

Details

Middle/Senior High School, Renovation, 1 Middle/Senior High School, 76,362 SF Renovation, Building.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents