Reported 05/19/2022 12:39 PM
Project Title

Water Tower 4 Rehabilitation

Physical Address View project details and contacts
City, State (County) Cary, IL 60013   (McHenry County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

400,000 Gallon Spheriod (#4) Exterior Repaint with Containment, Wet Interior Repaint, Dry Interior Partial Repaint And Miscellaneous Repairs. The structure is a 400,000 gallon spheroid with a low-water level of 114 ft. The work includes: Exterior: Abrasive blast clean to a SSPC-SP6 commercial standard within containment and apply a four (4) coat zinc epoxy urethane system. Wet Interior: Abrasive blast clean to a SSPC-SP10 near-white metal standard and apply a three (3) coat zinc epoxy system. Apply a polyurethane caulk to the roof lap seams. Dry Interior: Abrasive blast clean the entire tops of the platforms (including 1 ft. up the riser wall), the entire bowl, the entire access tube, and spot failures throughout to a SSPC-SP6 commercial standard. Apply a three (3) coat epoxy system to the access tube and bowl and a spot two (2) coat epoxy system to the rest of the prepared surfaces. Foundation: Abrasive blast clean and apply a two (2) coat epoxy system. Mixer: Install a mechanical mixer. Repairs: 1) Replace the access tube manway gasket. 2) Install a gasket on the wet interior roof hatch. 3) Install ladder extension at the condensate platform. 4) Retape loose insulation on the fill/draw pipe. 5) Install a flap gate on the overflow discharge. 6) Install a mud valve. 7) Install cathodic clips and coupling. 8) Install a roof handrail with a painter`s rail. 9) Remove the antenna podmount and rebuild the access tube cover. 10) Install antenna cable routing brackets. 11) Replace dry interior light bulbs. 12) Replace the aviation light. 13) Install j-hooks in the riser and cap the riser penetrations. 14) Weld a rigging lug on the bowl. 15) Install a sample tap on the fill/draw pipe.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents