Similar Projects
Water System Improvements
Bidding
Less than $1,921,000 est. value
Augusta, WV 26704

Water System Improvements - Water Line Replacements and Extension - Contract 1
Bidding
$5,275,050 est. value
New Creek, WV 26743

Proposed Water Line Replacement - Contract 1
Post-Bid
Paden City, WV 26157

Right Fork Water Line Extension Project
Post-Bid
Danville, WV

Z--Installation of Pipe Insulation and PVC Jackets on Overhead Water Lines
Results
Less than $50,000 est. value
Kearneysville, WV 25430

Cardinal Pointe Water Main
Results
$2,000,000 est. value
Martinsburg, WV 25401

Water System Improvements - Water Meter, Radio Transmitters and Equipment Replacement - Contract 4
Bidding
$380,300 est. value
New Creek, WV 26743

Water System Improvements
Term Contract
Post-Bid
$2,700,000 est. value
Wellsburg, WV

Contract #4 - Proposed Water Line Replacement
Results
Middlebourne, WV 26149

Inflow and Infiltration Rehabilitation
New Construction
Bidding
Charleston, WV

Main Street, Charles Street, and Commerce Street Waterline Replacement
Post-Bid
$1,745,000 est. value
Wellsburg, WV 26070

Water Line Relocation – Elk Fork Road (CR 11)
Results
Less than $43,860 est. value
Friendly, WV 26146

Water System Improvements
New Construction
Bidding
$9,255,000 est. value
Fairmont, WV 26554

Arlington/Glen Falls Water Line Improvement Project
Results
Clarksburg, WV 26301

Waterline Replacement
Bidding
$25,000 to $100,000 est. value
WV

Last Updated 02/22/2021 10:39 AM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Wellsburg, WV 26070   (Brooke County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 – Office and Maintenance Building; Contract No. 2 – Water Mains and Pumping Stations; Contract No. 3 – Furnishing Drive-By Automatic Water Meter Reading System. Construction of office and maintenance buildings, modifications to the existing water mains, piping upgrades at the Chapman Hill Water Storage Tank vault, replacement of vault hatches at the Rabbit Hill and SR 88 Water Storage Tanks, modifications at the Rabbit Hill and the High Street Water Pumping Stations, construction of an ew emergency water pumping station and water main to connect the Washington Pike PSD Water System to the city of Follansbee Water System, replacement of the existing pumping station controls and replacement of water meters with drive-by automatic meter reading system.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents