Similar Projects
Stripping and Waxing of Floors
Bidding
Mobile, AL

Flooring Annual Contract
Term Contract
Bidding
Mobile, AL

Flooring Improvements for Lauderdale County Schools
Post-Bid
Florence, Killen, Lexington, Rogersville, Waterloo, AL 35631

Government Plaza Lobby Flooring Replacement
Post-Bid
Mobile, AL 36602

Gym Floor Restoration and Repair Services
Term Contract
Results
Huntsville, AL

Dothan Opera House Carpet Replacement
Results
Dothan, AL 36302

Rubber Base Gym Floor Installations
Post-Bid
Fairfield, AL

New Cabinets and Tile for Fire Station 1
Results
Fairhope, AL 36533

UAB North Pavilion 2nd Floor Food Court Flooring Replacement
Post-Bid
Birmingham, AL 35294

UAH Olin King Technology Hall Flooring Replacement
Results
Less than $193,000 est. value
Huntsville, AL 35805

Community Health Services Building 20th Street 1st Floor Sparks Clinic Renovation – LVT Flooring
Post-Bid
$50,000 to $90,000 est. value
Birmingham, AL 35294

Gymnasium Floor Replacement at Raymond Hill Community Center
Results
Gadsden, AL 35902

Carpet and LVT
Post-Bid
Montgomery, AL 36130

Flooring Replacement and Painting
Post-Bid
Mobile, AL 36606

Flooring Municipal Complex
Post-Bid
Phenix City, AL 36867

Reported 02/14/2020 12:00 AM
Project Title

Stripping and Waxing Vinyl Composition Tile Floors Stegall

Physical Address View project details and contacts
City, State (County) Enterprise, AL   (Coffee County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Stripping and Waxing Scope of Work: 1. Make photographs of all rooms and areas before moving any furnishings 2. Remove all furnishings, boxes, etc. in all areas except computer and computer equipment (note #1 ). Mounted fixtures, cabinets, etc. to remain 3. Strip and detail clean each area to achieve a clean floor (no old wax or sealer should be present) 4. Apply two (2) coats of Diversey Plaza Sealer allowing to adequately dry between coats and per the manufacturer's directions, specifications and recommendations 5. Apply five (5) coats of Diversey Vectra Wax allowing to adequately dry between coats and per the manufacturer's directions, specifications and recommendations 6. Allow to adequately dry and burnish all floors with a white pad 7. Replace all furnishings, boxes, etc. 8. Clean any dust from walls, window sills, furnishings, etc. generated by prep work

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents