Similar Projects
SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

Two Lane Resurfacing - Front Street
Infrastructure
Bidding
$381,404 CJ est. value
Marietta, OH 45750

Two Lane Resurfacing - Front Street
Infrastructure
Bidding
$381,404 CJ est. value
Marietta, OH 45750

Four Lane Resurfacing - SR 618-03.22
Infrastructure
Post-Bid
$1,151,543 est. value
OH

Cold Patch, Chip and Seal - Applied Single and Double
Infrastructure
Post-Bid
Barlow, OH

Paving of Washington County Road 340, 102 and 4
Infrastructure
Results
$389,237 est. value
Marietta, OH 45750

OPWC Round 34- C-3,30,446 Resurfacing Project
Infrastructure
Results
$804,403 est. value
OH

Bridge Preservation - SR 530
Demolition, New Construction, Infrastructure
Design
$320,000 CJ est. value
Lowell, OH 45744

Jane Edwards Head Start Renovation ADA Ramp
Infrastructure, Renovation
Bidding
$300,000 CJ est. value
Marietta, OH 45750

Chip and Seal Dust Control
Infrastructure
Post-Bid
Waterford, OH

Hayward Run Bridge C-102-0359
Renovation, Infrastructure
Results
$274,298 est. value
OH

Geologic Maintenance / Slide Repair - SR 676
Infrastructure
Design
$640,000 CJ est. value
Vincent, OH 45784

Resurfacing of Various Waterford Township Roads
Infrastructure
Post-Bid
Waterford, OH

Resurfacing on C-32 Sparling Road and C-102 Milner Road
Infrastructure
Results
$1,509,601 est. value
OH

Last Updated 12/27/2022 03:07 PM
Project Title

Hills Covered Bridge Project

Physical Address View project details and contacts
City, State (County) Marietta, OH 45750   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $804,827 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project will be rebid at a later date The furnishing of all services, labor, equipment and materials required for the Hills Covered Bridge Project C-333-0095 in Washington County. The estimated cost of this project is $819,438 and the project cannot be awarded if the bid price exceeds the estimate by 10%. The intent of the Contract Documents is to provide for the construction and completion of the Work. Perform the Work according to the Contract Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents