Similar Projects
Tom Thumb at the Center
New Construction - 8,138 SF
Conception
Tallahassee, FL 32303

Tom Thumb at the Center
New Construction - 8,138 SF
Conception
Tallahassee, FL 32303

SunStop at Summit East
New Construction - 5,390 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Tallahassee, FL 32317

SunStop at Summit East
New Construction - 5,390 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Tallahassee, FL 32317

Publix #1836
New Construction
Post-Bid
$4,000,000 est. value
Tallahassee, FL

Publix #1306
Renovation
Construction
$915,500 est. value
Tallahassee, FL 32309

Circle K
New Construction - 5,533 SF
Construction
$1,200,000 est. value
Tallahassee, FL 32303

Crawfordville Highway Redevelopment
New Construction
Pending Verification
Tallahassee, FL

Crawfordville Highway Redevelopment
New Construction
Pending Verification
Tallahassee, FL

Four Point Convenience Store and Fuel
New Construction
Conception
Tallahassee, FL 32304

Farm Stores #4001
New Construction - 675 SF
Construction
$75,000 est. value
Tallahassee, FL 32303

Farm Stores
New Construction - 675 SF
Pending Verification
$75,000 est. value
Bradfordville, FL

Tom Thumb
New Construction
Conception
Tallahassee, FL 32304

SunStop #526
New Construction - 7,356 SF
Conception
Tallahassee, FL 32303

Convenience Store with Fuel
New Construction - 6,500 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Tallahassee, FL 32304

Last Updated 02/01/2022 11:21 AM
Project Title

SunStop #519

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32308   (Leon County)
Category(s) Commercial
Sub-Category(s) Gas Station, Supermarket/Convenience Store
Contracting Method General Contractor to Subcontract.
Project Status Design Development, Sub-Bidding Expected third quarter 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

7,400 SF - Gas Station, Approximately 2,000 SF New Construction, Supermarket/Convenience Store, Approximately 5,400 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents