Similar Projects
Trimble Road (Joppa Road to Garnett Road) - H204522 - Harford County
Infrastructure
Conception
$2,000,000 est. value
Joppatowne, MD 21085

Norrisville Park - P204117 - Harford County
New Construction, Infrastructure
Conception
$2,400,000 est. value
White Hall, MD 21161

For City of Havre de Grace - Rehabilitation and Replacement 8 Inch and 15 Inch Sanitary Sewer at Saint Johns and S. Washington Streets
Infrastructure
Design
$200,000 CJ est. value
Havre de Grace, MD 21078

Sunnyview Stream Restoration - A084107 - Harford County
Infrastructure
Design
$2,937,220 CJ est. value
Bel Air, MD 21014

Rehabilitation of Bridge H-0103 and H-0133 Troyer Road over Tributary of Little Deer Creek and Linkous Road over Falling Branch
Infrastructure
Bidding
$3,000,000 CJ est. value
Bel Air, MD 21014

Chesapeake Welcome Center Renovation And Expansion Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$905,150 CJ est. value
Bel Air, MD 21015

RFQ Construction Manager - Harford Technical High School Limited Renovation
Infrastructure, Renovation
Post-Bid
$37,380,500 CJ est. value
Bel Air, MD 21015

RFQ Contractor - Harford Community College Chesapeake Welcome Center
New Construction, Renovation, Infrastructure - 75,000 SF
Post-Bid
$29,429,202 CJ est. value
Bel Air, MD 21015

Replacement of National Guard Pump Station and Force Main
Infrastructure
Results
Havre de Grace, MD

Drainage Outfall Rehabilitation
Infrastructure
Results
$2,793,273 CJ est. value
Baltimore, MD 21202

Shops at Harford Mall
New Construction, Infrastructure - 59,609 SF
Construction
$16,000,000 CJ est. value
Bel Air, MD 21014

Bel Air Village
New Construction, Infrastructure - 129,130 SF
Construction
$143,000,000 CJ est. value
Bel Air, MD 21015

Country Walk
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Bel Air, MD 21015

YourSpace At Five43
New Construction, Infrastructure - 118,850 SF
Pending Verification
$16,000,000 CJ est. value
Bel Air, MD 21015

Central W&S Laboratory - W205425 - Harford County
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Abingdon, MD 21009

Last Updated 05/12/2023 03:07 PM
Project Title

Erie Street Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Havre de Grace, MD 21078   (Harford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Replace three (3) 8' valves with DeZurik 8" PEF Rectangular Port Eccentric Plug Valve Flange. PEF, 8, FI, Ci, NBR, CR, S30 SCO GS-6A HD8, SB16 2. Replace three (3) 12" Valves with Dezurik 12" PEF Rectangular Port Eccentric Plug Valve Flange. PEF, 12, F1, C1, NBR, S30 SC0 GS-6A-HD12, SB16 3. Testing of Final Installation. This includes checking installation setting and testing valve limits for proper operation. Equal Employment Opportunity--All contracts shall contain a provision requiring compliance with E.O. 11246, "Equal Employment Opportunity," as amended by E.O. 11375, "Amending Executive Order 11246 Relating to Equal Employment Opportunity," and as supplemented by regulations at 41 CFR part 60, "Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor." Copeland "Anti-Kickback" Act (18 U.S.C. 874 and 40 U.S.C. 276c)--All contracts and subgrants in excess of $2000 for construction or repair awarded by recipients and subrecipients shall include a provision for compliance with the Copeland "Anti-Kickback" Act (18 U.S.C. 874), as supplemented by Department of Labor regulations (29 CFR part 3, "Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States"). The Act provides that each contractor or subrecipient shall be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he is otherwise entitled. The recipient shall report all suspected or reported violations to the Federal awarding agency. Davis-Bacon Act, as amended (40 U.S.C. 276a to a-7)--When required by Federal program legislation, all construction contracts awarded by the recipients and subrecipients of more than $2000 shall include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 276a to a-7) and as supplemented by Department of Labor regulations (29 CFR part 5, "Labor Standards Provisions Applicable to Contracts Governing Federally Financed and Assisted Construction"). Under this Act, contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination made by the Secretary of Labor. In addition, contractors shall be required to pay wages not less than once a week. The recipient shall place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation and the award of a contract shall be conditioned upon the acceptance of the wage determination. The recipient shall report all suspected or reported violations to the Federal awarding agency. Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333)--Where applicable, all contracts awarded by recipients in excess of $2000 for construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or laborers shall include a provision for compliance with Sections 102 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333), as supplemented by Department of Labor regulations (29 CFR part 5). Under Section 102 of the Act, each contractor shall be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than 11/2 times the basic rate of pay for all hours worked in excess of 40 hours in the work week. Section 107 of the Act is applicable to construction work and provides that no laborer or mechanic shall be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence. Rights to Inventions Made Under a Contract or Agreement--Contracts or agreements for the performance of experimental, developmental, or research work shall provide for the rights of the Federal Government and the recipient in any resulting invention in accordance with 37 CFR part 401, "Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements," and any implementing regulations issued by the awarding agency. Clean Air Act (42 U.S.C. 7401 et. seq.) and the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq.), as amended--Contracts and subgrants of amounts in excess of $100,000 shall contain a provision that requires the recipient to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401 et seq.) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251 et seq.). Violations shall be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA). Byrd Anti-Lobbying Amendment (31 U.S.C. 1352)--Contractors who apply or bid for an award of $100,000 or more shall file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the recipient. Debarment and Suspension (E.O.s 12549 and 12689)--All parties doing business with the Department of Agriculture should consult the Department's regulations for debarment and suspension found at 7 CFR 3017. No contract shall be made to parties listed on the General Services Administration's List of Parties Excluded from Federal Procurement or Non-procurement Programs in accordance with E.O.s 12549 and 12689, "Debarment and Suspension." This list contains the names of parties debarred, suspended, or otherwise excluded by agencies, and contractors declared ineligible under statutory or regulatory authority other than E.O. 12549. Contractors with awards that exceed the small purchase threshold shall provide the required certification regarding its exclusion status and that of its principal employees. Project Cost Class B - $100,000 to $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents