Similar Projects
Publix - Summers Corner / Summerville (Ladson)
New Construction, Infrastructure - 51,454 SF
Conception
$12,000,000 CJ est. value
Ladson, SC 29485

Pump Station 104 Rehabilitation - Dorchester County
Renovation
Conception
$500,000 CJ est. value
Summerville, SC 29483

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Design
$18,000,000 CJ est. value
Summerville, SC 29485

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

Baker Collection
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Summerville, SC 29483

Wassamassaw Playground Improvements and Cost Estimate
Infrastructure
Bidding
$120,000 CJ est. value
Summerville, SC 29484

RFP D/B - Summerville Fire-Rescue Station 6
New Construction, Infrastructure
Post-Bid
$3,094,921 CJ est. value
Summerville, SC 29485

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

Pump Station Rehabilitation Projects
Renovation
Results
$300,000 est. value
Saint George, SC

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Widening - I-26 (187-194)
Infrastructure
Construction
$179,987,105 CJ est. value
Summerville, SC 29483

Wastewater Treatment Plant Expansion and Improvements
Infrastructure
Construction
$10,000,000 CJ est. value
Summerville, SC 29483

Coastal Crossroad Logistics Center Phase 1 and 2
New Construction, Infrastructure - 2,500,000 SF
Pending Verification
$200,000,000 CJ est. value
Summerville, SC 29483

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Last Updated 10/09/2023 06:32 PM
Project Title

RFP Construction Manager at Risk - Sawmill Branch Water Supply - Booster Pumping and Storage Improvements

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $11,887,520 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Wharton-Smith is the Construction Manager at Risk (CMAR), who is soliciting proposals for the Summerville CPW for the Sawmill Branch Water Supply Booster Pumping and Storage Improvements Project. Wharton-Smith is soliciting bids from qualified firms. DBE firms are encouraged to participate. The following Subcontractor Bid Packages are available for bidding: Clearing & Grubbing, Erosion Control, Piping, Valves, Electrical, Pump Skid Package, Masonry, Concrete Supply, Rebar Supply, Precast Building, HVAC, Fencing, Elevated Water Tank Demo, Electrical, Painting, and Coatings. Any bid received after that time may not be considered. Funding for the project may be provided through a variety of sources, including: South Carolina Infrastructure Investment Program (SCIIP) grants, State Revolving Fund (SRF) loans, and local funding. Offerors must comply with all applicable state and federal requirements, including, Davis-Bacon wage rates, American Iron & Steel, and Build America, Buy America provisions, if required.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents