Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Asphalt Surface with Grade and Drain- E Main Street (Us 68) (Mp 12.900)
Infrastructure
Bidding
KY

Road Resurfacing
Infrastructure
Bidding
Independence, KY 41051

Shoreline Erosion Control Green River Lock and Dam #1
Post-Bid
$25,000 to $100,000 est. value
Reed, KY

Middlesboro, KY Channel Clearing
Post-Bid
$1,000,000 to $5,000,000 est. value
Middlesborough, KY

8010 Mimosa Drive Bank Repair
Results
$50,000 to $100,000 est. value
Louisville, KY 40203

ELR 72 Culvert Replacement - Dodsworth Lane
Results
KY

Bellevue Hillside Stabilization
Infrastructure
Bidding
Bellevue, KY

8018 South Third Street Road - Drainage Improvement and Building Underpinning
Post-Bid
Louisville, KY 40214

Main Line Drain Replacement
Results
Henderson, KY 42420

Judy & Freddie Moore AML Reclamation
Infrastructure
Bidding
Langley, KY 41645

Brashear's Creek Road, East River Road, Little Mount Church Road Flood Repair
Post-Bid
Taylorsville, KY 40071

Culvert Replacement
Results
KY

Box Culverts Installation
Post-Bid
Danville, KY 40422

Last Updated 02/07/2022 02:27 AM
Project Title

Middle Fork Beech Creek AML Reclamation

Physical Address View project details and contacts
City, State (County) Drakesboro, KY   (Muhlenberg County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Middle Beech Creek AMD abatement project AKA Pond Creek Bond Forfieture consists of 115 acres and includes acidic and high iron discharge. This site includes a title V bond forfeiture permit. The site is located near Beech Creek in Muhlenberg County, KY at Latitude 37° 10'21" N and longitude 87° 04'11" W. To reach the site from the Central City exit on the Western Kentucky Parkway, take US 431 South through Drakesboro for 6.2 miles, then turn right onto KY 172, next, go 2.2 miles, then turn left onto KY 246-20, then go 150’, turn left onto Merle Travis Highway, then go 2 miles, then turn right onto Beech Creek Road, go 0.3 miles, then turn right onto Wyatt Cemetery Rd. Proposed are three class III diversion ditches with limestone sand, 4400 linear feet total. Also proposed is covering and reseeding bare areas within the 115 acres of the site. The rock in the ditches will be high purity limestone. Elimination of pit(s) will be part of the project scope, to treat then release water once up to defined standards as called for in AML technical specifications. Silt control will be established prior to construction activities except for site prep for access. Silt control will be a mixture of silt traps and/ or straw bales and silt fences. Additionally, best management practices will be utilized to the extend practical. Vegetation on the site consist of a mixture of grassland and trees. Removal of trees will be minimized to the extent practical. However, Trees will be cut when necessary to complete the proposed construction activities. All disturbed areas will be promptly revegetated at the end of construction.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents