Similar Projects
Chequamegon-Nicolet National Forest - Bass Lake Recreation Area Well Replacement
Design
Rhinelander, WI 54501

Waukesha Water Utility Booster Pumping Station Contract 3 And 3A
Term Contract
Bidding
Waukesha, WI

Vertical Gas Collection Wells
Bidding
Appleton, WI 54911

Sump System Installation
Post-Bid
Two Rivers, WI 54241

2020 Waste Activated Sludge Pump
Post-Bid
Madison, WI 53713

Rehabilitation of Wells 15 and 17 at City Well Field
Results
Eau Claire, WI 54701

2020 Rotary Lobe Pumping Unit Purchases
Results
Madison, WI 53713

Well 18 Treatment
Post-Bid
Less than $160,000 est. value
Madison, WI 53713

Municipal Well 4 – Well Construction
Results
Wausaukee, WI 54177

Polymer Pump Nos. 4, 5 and 6 Replacement
Post-Bid
Oak Creek, WI 53154

2020 Bypass Pump Rehabilitation
Results
Milwaukee, WI

Well No.3 Manganese Removal
Post-Bid
Grantsburg, WI

Sun Prairie Utilities Test Well for Well 10
Results
Sun Prairie, WI

2021 Grinder, Pump Stations 17
Post-Bid
Madison, WI

Pump House No.10 Improvements
Results
Muskego, WI

Last Updated 01/05/2021 02:52 PM
Project Title

2020 Grinder, Pump Station 17

Physical Address View project details and contacts
City, State (County) Madison, WI   (Dane County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(NEW) Grinder, Same or approved equivalent to a Muffin Monster, without any channel or electrical modifications One (1) 30004T-1200 Monster Renew – JWC: • 11 Tooth Cam Cutters • 1:1 Stack Hardened Alloy STL • Buna N Elastomers • Cork & Rubber Gaskets • Less Motor • Less Reducer • Less Unibody • Less Spool • Paint Epoxy Green • Per original s/n G017379-2-1

Details

Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents