Similar Projects
District-Wide Professional Horticultural Installations
Bidding
CO

Five Points District-Wide Professional Care Services
Bidding
CO

Z--NAVFACSW Competitive Small Business Set-Aside Multiple Award Service Contract (MASC) for Grounds Maintenance and Landscaping, and Pavement Clearance Work to be Performed at Various Locations
Term Contract
Post-Bid

Landscape Maintenance Services
Post-Bid
Denver, CO

2019 Citywide Concrete Spot Repairs, Phase 2
Results
Less than $495,082 est. value
Denver, CO 80202

South Federal Raised Medians project
Results
$1,000,000 to $5,000,000 est. value
CO

Polo Club Place Drainage and Roadway
Renovation
Construction
Denver, CO

Curb Repair for Holly Lot - Ahec-20402-D
Post-Bid
Denver, CO

2020 Citywide Bond Concrete Repair
Results
$2,250,000 to $2,750,000 est. value
Denver, CO

Parkway Tree Pruning Services
Post-Bid
Denver, CO 80202

2020 Citywide Concrete Spot Repairs, Phase 1
Results
Less than $750,000 est. value
Denver, CO 80202

Landscape Maintenance Services Unison Housing Affordable Communities
Term Contract
Post-Bid
Denver, Thornton, Westminster, CO 80030

Highline Canal Trail Underpass at Parker Road and Mississippi Avenue
Results
Less than $4,223,136 est. value
Denver, CO 80202

Landscaping and Grounds Maintenance Supply (Fertilizer)
Post-Bid
Denver, CO 80202

Region 1 Up-Grade ADA Curb Ramp at Varies Locations
Results
$1,000,000 to $5,000,000 est. value
CO

Last Updated 03/30/2020 02:57 PM
Project Title

Harvey Park - Irrigation Renovations Phase II and Gap Sidewalk

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping/Irrigation, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,621,508
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This irrigation improvements project is necessitated by conversion of the existing potable water irrigation system to a new raw water system drawn from Harvey Park Lake and replenished by water from the Ward Reservoir #5. A new pump house and associated piping, and lake interconnect. The irrigation system will include: providing, installing, and energizing the pumps; constructing pump house and providing connections and controls; install mainline and lateral piping, controllers, valves, and heads to irrigate the entire park. Construct approximately 10,500 sq. ft. of 5' attached walk along W. Evans Ave. street frontage; remove 2 existing curb cuts for the access to existing maintenance trail and reconstruct 10' wide curb cuts at the same location. Remove and replace existing signage.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents