Similar Projects
Sewer Projects: Don Avenue/Curtis Street - City of Anderson
Infrastructure
Conception
$500,000 CJ est. value
Anderson, SC 29624

Generostee Relief Sewer - City of Anderson
Infrastructure
Conception
$19,300,000 CJ est. value
Anderson, SC 29624

Infrastructure Water Line Removal - West Market Street Roundabout - City of Anderson
Infrastructure
Design
$310,000 CJ est. value
Anderson, SC 29624

Linley Park South - Construction of 9 Mile Link - City of Anderson
Infrastructure
Design
$5,500,000 CJ est. value
Anderson, SC 29625

Intersection improvement US 29/S-96 (Welcome Rd)
Infrastructure
Bidding
$2,272,000 CJ est. value
Anderson, SC 29621

Wastewater Trunk Line Replacement from the Big Creek Wastewater Treatment Plant to Mineral Springs Park
Infrastructure
Bidding
$750,000 CJ est. value
Williamston, SC 29697

D.B. Walker Phase II Park Improvements
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Anderson, SC 29624

Leda Poore Park, New Concession Stand and Press Box
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Belton, SC 29627

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Lake Secession Waterline Extension FY22
Infrastructure
Results
$597,200 CJ est. value
Iva, SC 29655

Tiger Cove RV Park
New Construction, Infrastructure - 3,000 SF
Construction
$6,000,000 CJ est. value
Anderson, SC 29626

Techtronic Industries Manufacturing Plant and Warehouse
Addition, Demolition, Infrastructure - 1,000,000 SF
Pending Verification
$75,000,000 CJ est. value
Anderson, SC 29621

Anderson County Energy Center
New Construction, Infrastructure
Pending Verification
$700,000,000 CJ est. value
Anderson, SC 29621

Murphy Express / Anderson
New Construction, Infrastructure - 2,800 SF
Conception
$2,500,000 CJ est. value
Anderson, SC 29624

ACTC #135 & #136 Resurfacing Project
Infrastructure
Bidding
$778,000 CJ est. value
Anderson, SC 29621

Last Updated 08/23/2023 05:31 AM
Project Title

Six & Twenty WWTP Decommissioning Project

Physical Address View project details and contacts
City, State (County) Anderson, SC 29624   (Anderson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $9,071,058 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

COMPLETION DATE: After Notice to Proceed, 570 calendar days to delivery. SCOPE OF WORK A. All concrete structures designed to hold water shall be constructed of Class A reinforced concrete, and all structures shall be made completely watertight. The General Specifications for Reinforced Concrete included herein set forth the requirements for mix design details of constructing reinforcement, etc. B. All surfaces of concrete structures that will be exposed after backfilling shall be formed with prefabricated plywood or metal forms. All exposed surfaces shall be rubbed with a carbide stone until all form marks have been removed and all exposed surfaces shall be formed true to within a plus or minus 1/8 tolerance.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents