Similar Projects
Cactus, Las Vegas Boulevard to Bermuda - Clark County
Infrastructure
Conception
Las Vegas, NV 89183

Abundant Heart Community Church
New Construction - 30,000 SF
Conception
$8,500,000 est. value
North Las Vegas, NV 89032

RFQ Construction Manager at Risk - Downtown Civic Center Building and Plaza
New Construction, Infrastructure
Design
$170,000,000 CJ est. value
Las Vegas, NV 89101

Anand Mandir-Temple Complex
New Construction - 8,091 SF
Design
$3,050,000 est. value
Henderson, NV 89015

Bike Trail Surface Repair, Lake Mead, Nevada
Infrastructure
Bidding
$400,000 est. value
Boulder City, NV 89005

Silverado Ranch Park New Community Center
New Construction, Infrastructure - 39,925 SF
Bidding
$19,000,000 CJ est. value
Las Vegas, NV 89183

New Campus Signage Rebid
Infrastructure
Sub-Bidding
$2,850,000 CJ est. value
Las Vegas, NV 89154

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Delta Academy - Exterior
Alteration
Post-Bid
$85,680 est. value
North Las Vegas, NV 89030

Pavement Replacement Services 2021-2023 - Large Row Site Locations
Results
Less than $1,997,250 est. value
Las Vegas, NV

Harley A. Harmon Elementary School Elementary School Replacement
New Construction - 101,207 SF
Results
$30,500,000 est. value
Las Vegas, NV 89120

LDS Las Vegas Institute
Renovation
Construction
$200,000 est. value
Las Vegas, NV 89119

Wat Nevada Dhammaram
New Construction - 2,493 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Henderson, NV 89044

King's Church Las Vegas
New Construction
Pending Verification
Las Vegas, NV 89145

West Henderson Recreation And Aquatics Complex - MF417 - City of Henderson
New Construction, Infrastructure
Conception
$55,000,000 CJ est. value
Henderson, NV 89015

Last Updated 08/05/2022 12:04 PM
Project Title

Chabad of Green Valley

Physical Address View project details and contacts
City, State (County) Henderson, NV 89052   (Clark County)
Category(s) Education, Heavy and Highway, Religious/Funeral
Sub-Category(s) Elementary School, Paving/Reconstruction, Religious Facility, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BUILDING SIZE Building 1 (Religious Assembly/School): 9,396 square feet Building 2 (Day Care): 2,956 square feet Building 3 (Religious Studies/Bathrooms: 2,501 square feet TOTAL: 14,853 square feet The facility will include synagogue, social hall, kitchen, preschool/kindergarten, children's playground, administrative offices, library, classrooms for adult education, gated entrance from Carnegie Street, fenced property with enhanced security. As of August 5, 2022 this project is in design. A public hearing is scheduled for Thursday, August 11, 2022. A timeline for construction has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

14,853 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Casework, Specialty Casework, Religious Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents