Similar Projects
105th Concrete Drainage Ditch
Infrastructure
Design
$69,516 CJ est. value
Live Oak, FL 32060

I-75 Gateway Signage
Infrastructure
Sub-Bidding
$90,000 CJ est. value
Ocala, FL 34482

SPCC Exterior Ceiling Replacement
Post-Bid
$243,375 est. value
Miami, FL 33132

Waterproofing Services
Alteration
Post-Bid
$6,000,000 est. value
Tampa, FL 33619

Covered Structure Replacement/Repair Over School Playground Area
Results
$325,537 est. value
Rotonda West, FL 33947

Solar Panel and Awning Fabrication, Installation and Financing
Results
Winter Park, FL

NB Cook Elementary School Building Envelope Repair
Construction
Pensacola, FL 32503

NHMFL Exterior Metal Siding Repairs
Construction
Tallahassee, FL 32306

Disston Stairs Remediation
Term Contract, Alteration
Post-Bid
Saint Petersburg, FL 33709

Aircraft Sunshade Repair
Term Contract
Results
Eglin AFB, FL 32542

Flag Pole Replacement at Fred Howard Park
Alteration
Post-Bid
Tarpon Springs, FL 34689

Stonecrest WWTF Stairway and Handrail Addition
Addition
Results
$50,000 est. value
Summerfield, FL 34491

Driveway Repair/Replacement
Alteration
Post-Bid
Okeechobee, FL 34974

Main Library Exterior Refurbishment
Alteration
Results
$109,675 est. value
Fort Lauderdale, FL 33301

Exterior Building Maintenance
Alteration
Post-Bid
Gainesville, FL 32641

Last Updated 01/09/2023 10:31 PM
Project Title

39th Avenue Northeast - Waterways Wall Extension

Physical Address View project details and contacts
City, State (County) Naples, FL 34120   (Collier County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $299,966 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of 39th Avenue NE - Waterways Wall Extension No bid shall be considered unless it is made on unaltered Bid forms which are included in the Bidding Documents. One contract will be awarded for all Work Each bid shall be accompanied by a certified or cashiers check or a Bid Bond in an amount not less than five percent (5%) of the total Bid to be retained as liquidated damages in the event the Successful Bidder fails to execute the Agreement and file the required bonds and insurance within ten (10) calendar days after the receipt of the Notice of Award. The Successful Bidder acknowledges and agrees that it shall execute the Agreement in the form attached hereto and incorporated herein. The Successful Bidder shall be required to furnish the necessary Payment and Performance Bonds, as prescribed in the General Conditions of the Contract Documents. All Bid Bonds, Payment and Performance Bonds, Insurance Contracts and Certificates of Insurance shall be either executed by or countersigned by a licensed resident agent of the surety or insurance company having its place of business in the State of Florida. Further, the said surety or insurance company shall be duly licensed and qualified to do business in the State of Florida. Attorneys-in-fact that sign Bid Bonds or Payment and Performance Bonds must file with each bond a certified and effective dated copy of their Power of Attorney. In order to perform public work, the Successful Bidder shall, as applicable, hold or obtain such contractor's and business licenses, certifications and registrations as required by State statutes and County ordinances. Before a contract will be awarded for the Work contemplated herein, the Owner shall conduct such investigations as it deems necessary to determine the performance record and ability of the apparent low Bidder to perform the size and type of work specified in the Bidding Documents. Upon request, the Bidder shall submit such information as deemed necessary by the Owner to evaluate the Bidder's qualifications. The Successful Bidder shall be required to finally complete all Work within two hundred ten days (210) calendar days from and after the Commencement Date specified in the Notice to Proceed. The final completion days includes substantial completion days of one hundred eighty days (180) calendar days, with an additional thirty (30) calendar days to final completion. Should Contractor fail to achieve Substantial Completion within the number of calendar days established herein, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, three hundred dollars ($300) for each calendar day thereafter until Substantial Completion is achieved. Unless otherwise specified, work will be limited to the hours of 7:00 a.m. to 7:00 p.m., Monday through Friday. The Owner reserves the right to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents, and to postpone the award of the contract for a period of time which, however, shall not extend beyond one hundred eighty (180) days from the bid opening date without the consent of the Successful Bidder

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents