Similar Projects
Heritage Hunt Sewage Pumping Station (SPS) and Force Main (FM) Project
New Construction
Design
Woodbridge, VA

Grease Trap Pumping Services
Term Contract
Bidding
Abingdon, Duffield, Haysi, Tazewell, VA 24244

Grease Trap Pumping Services
Term Contract
Bidding
Abingdon, Duffield, Haysi, Tazewell, VA 24244

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Job Order Contract (JOC) for On-Call Water and Sewer Maintenance, Repairs and Construction
Term Contract
Post-Bid
$1,000 to $500,000 est. value
VA

Construction of the Leachate Pump Station
Results
$2,586,790 est. value
Leesburg, VA 20175

Rehabilitation of the Gulf Run Sanitary Sewer Force Main
Results
Arlington, VA 22201

Pump Station 23 Service Area Phase 8
Construction
Less than $4,500,000 est. value
Norfolk, VA

Langley School Pump Station and Force Main
Construction
$3,400,000 est. value
McLean, VA 22101

Pump Station Repair Annual Services Contract
Term Contract
Bidding
Portsmouth, VA

General Water and Sewer Services
Post-Bid
Hillsville, VA 24343

Phase 3 Sanitary Sewer Rehabilitation
Results
Elkton, VA 22827

Elbyrne Drive Water and Sewer Renewal
Infrastructure
Bidding
Chesapeake, VA

Provide Grease Traps Services
Post-Bid
Portsmouth, VA 23703

River Oaks, Pump Station 44 Service Area, Phase 1, Water and Sewer Replacement
Results
$1,672,184 est. value
Norfolk, VA 23510

Last Updated 02/15/2022 02:23 PM
Project Title

Heritage Hunt Sewage Pumping Station, L52 Replacement, and Force Main Extension

Physical Address View project details and contacts
City, State (County) Gainesville, VA 20155   (Prince William County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Heritage Hunt Sewage Pumping Station Performance of all work as described in the contract documents for the construction of a new 7.81 MGD wet well/dry-pit sewage pump station. Furnish, installation and startup of all pump station equipment, including but not limited to; sewage pumps, grinder systems, carbon odor control, bioxide odor control, mechanical systems and generator. Maintaining service of existing pump station throughout duration of construction. Demolition of existing pump station structure and appurtenances after the startup of the new sewage pump station.• Site improvements, including but not limited to paving, grading, fencing and landscaping as shown on the design plans. Other sanitary sewer appurtenances of the Heritage Hunt Sewage Pumping Station. Heritage Hunt Force Main Performance of all work as described in the contract documents for the construction of a new 24-inch and 16-inch class 52 ductile iron force main. Site restoration and improvements, including but not limited to paving, grading, fencing and landscaping as shown on the design plans. Quality level A utility designation as described in the contract documents. Maintenance of traffic (MOT) and work zone safety measures as required by the contract documents. Testing and Start-up of new Force Main System.

Details

Lift and Pump Stations, New Construction.
Division 01 - General Requirements.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents