Similar Projects
Chapter Building 2
New Construction - 156,000 SF
Conception
Seattle, WA 98105

Dexter Avenue Apartment Building
New Construction, Demolition
Conception
Seattle, WA 98109

Chapter Building 1
New Construction - 251,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Seattle, WA 98105

800 Stewart
New Construction - 702,349 SF
Design
$10,000,000 CJ est. value
Seattle, WA 98101

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

Spring District Block 6 Office Building Parking Garage Retail
New Construction, Build-Out - 2,160 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Spring District Block 5 Office Building and Parking Garage
New Construction - 4,000 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

South Lake Union the Mercer Blocks
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Seattle, WA 98109

Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Last Updated 11/11/2022 10:34 AM
Project Title

Evergreen Hospital Medical Center Central Garage Repairs - Part 1

Physical Address View project details and contacts
City, State (County) Kirkland, WA 98034   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Parking Garage, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Please look at the Invitation to Bid regarding project Documents. Each bid shall be accompanied by bid proposal security in the form of a certified check, cashiers check, postal money order, or surety bond made payable to the order of King County Hospital District No. 2 for a sum of not less than five percent (5%) of the total amount bid. No bid shall be considered unless accompanied by such bid proposal security. The bid is for performing all Work including furnishing and installing equipment in accordance with the bid documents, plans and specifications. This is a public works project, and therefore must comply with prevailing wage requirements. Repairs to Level E of the Central Garage are as follows: Concrete beam repairs Install concrete Corbels PT cap inspections Demolition of Drains and install new drains Concrete topping slab demolition and replacement of concrete topping slab Apply waterproof deck coating Traffic Striping Bids shall be publicly opened and read, and the Owner shall proceed to canvass the bids and may award a contract, to the lowest responsive and responsible bidder on plans and specifications on file. The Owner reserves the right to waive all informalities, or to reject any or all bids, and no contract shall be let in excess of the estimated cost of such project. No bidders may withdraw their bids after the hour set for the receipt thereof unless the award of the contract is delayed for a period of sixty (60) calendar days from the date and time for receipt of the bids. The successful bidder shall enter into a contract in accordance with the bid and furnish a performance and payment bond in an amount to be fixed by the Owner within ten (10) calendar days from the date of the Notice of Award letter to the successful bidder. Otherwise, the bid proposal security shall be forfeited to the Owner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents