Similar Projects
Athens Street Improvements - City of Gainesville
Infrastructure, Alteration
Conception
$250,000 est. value
Gainesville, GA 30501

Mulberry Street Residential Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Flowery Branch, GA 30542

Sanitary Sewer Ream and Reline (8" DIP)
Infrastructure
Design
$200,000 CJ est. value
Flowery Branch, GA 30542

SR 53 Fm CS 656 / Cedar Ridge Dr to S of SR 211 / Tanner Mill Rd
Infrastructure
Design
$2,000,000 CJ est. value
Gainesville, GA 30501

Gateway Center Retail Shops
New Construction, Infrastructure - 5,995 SF
Bidding
$1,500,000 CJ est. value
Gainesville, GA 30501

Gateway Center Project / Gainesville
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Gainesville, GA 30501

AutoZone #0914 / Gainesville
New Construction, Infrastructure - 7,000 SF
Post-Bid
$1,500,000 CJ est. value
Gainesville, GA 30501

HCSD Replacement Elementary 1
New Construction
Post-Bid
Gainesville, GA 30501

Lula Elementary Renovations and Roof
Renovation
Results
Lula, GA 30554

Wauka Mountain Elementary School - Site Improvements
Results
Gainesville, GA 30506

Agile Cold Storage Freezer Distribution Hub
New Construction, Infrastructure - 150,000 SF
Pending Verification
$20,000,000 CJ est. value
Gainesville, GA 30507

Moss Farm
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Lula, GA 30554

Mitchell Street Improvements - City of Flowery Branch
Infrastructure
Conception
$851,126 CJ est. value
Flowery Branch, GA 30542

Solis Gainesville Mixed-Use Phase 2
New Construction, Infrastructure - 11,000 SF
Design
$52,000,000 CJ est. value
Gainesville, GA 30501

Kubota Loader Facility / Gainesville
New Construction, Infrastructure - 667,000 SF
Bidding
$80,000,000 CJ est. value
Gainesville, GA 30501

Last Updated 11/07/2022 01:33 PM
Project Title

RFP Construction Manager at Risk - Lyman Hall Elementary - Additions and Renovations 2022

Physical Address View project details and contacts
City, State (County) Gainesville, GA 30504   (Hall County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $18,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 26, 2022, a construction manager has been chosen and a budget has been approved. The projects will be done in phased and be complete by the start of the 2024-2025 school year. The Hall County Board of Education reserves the right to accept or reject any and all proposals and to waive technicalities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents