Similar Projects
MBMV212806 – Repair Warehouse Floor – BLDG 6901
Term Contract
Design
$250,000 to $500,000 est. value
Battle Creek, MI

MBMV212805 – Repair Hangar Floor – BLDG 6900
Term Contract
Bidding
$250,000 to $500,000 est. value
Battle Creek, MI 49037

Gym Floor Refinishing Repair Services
Alteration
Bidding
Highland, MI

Replacement Carpeting for St. Clair County Courthouse
Post-Bid
Port Huron, MI

Environmental Emergency Response and General Services
Post-Bid
Lansing, MI

2019 Floor Maintenance
Results
Corunna, MI

Webberville Elementary Gym Floor
Results
Webberville, MI

Gibson Elementary School Asbestos Abatement
Alteration
Bidding
Redford Township, MI 48239

Washington Woods Flooring Replacement
Post-Bid
Midland, MI

Provision and Installation of Rubber Floor Tile at the Ice Arena
Results
Less than $37,815 est. value
Farmington Hills, MI 48336

Pine Grove and University Village - Flooring Replacement 2021
Alteration
Bidding
Saginaw, MI 48604

Carpet Removal and New Flooring Installation
Post-Bid
Lawrence, MI

Lap Pool Tile Baseboard and Windowsill Replacement
Results
Livonia, MI 48154

DRCFA TCF Center Phase IV Project Tile Materials Only
Post-Bid
Detroit, MI 48226

City Hall: Painting, Miscellaneous Crack Repair and Flooring
Results
Hillsdale, MI 49242

Reported 07/14/2021 12:00 AM
Project Title

Abatement of VCT and Mastic for Flooring at Pine Towers

Physical Address View project details and contacts
City, State (County) Bay City, MI   (Bay County)
Category(s) Single Trades
Sub-Category(s) Environmental, Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Abatement of VCT and removal of carpet squares on eight (8) resident floors at Pine Towers, a senior/disabled housing development owned and operated by the Bay City Housing Commission (BCHC), Bay City, Michigan. Installation of replacement LVT on the 2nd through 9th floor corridors will be completed by flooring contractor under sperate contract. The successful contractor for floor covering removal will be required to coordinate scheduling with yet-to-be selected installation contractor. A smooth concrete surface is the objective. Report any conditions to owner contrary to contract requirements. A sealant will need to be applied to the abated area following VCT removal to seal any residue and prevent any tracking into apartments. A floor drawing (Page 10) notes approximate square foot calculations from our last flooring replacement. We recommend interested vendors to confirm quantity with their own measurements.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement, Asbestos Floor Tile and Mastic Abatement.
Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents