Similar Projects
Ohmeda Drive (New Street)
Infrastructure
Bidding
$600,000 CJ est. value
Madison, WI 53715

Line of Sight Reconstruction Parking Ramps 38 and 63
Infrastructure
Sub-Bidding
Madison, WI 53715

Median Conversion - Concrete 2022
Alteration
Post-Bid
$285,830 est. value
Madison, WI

Quonset Hut - Concrete
Alteration
Post-Bid
$150,000 est. value
Madison, WI 53704

Walking Iron Wetland Restoration Walking Iron County Park - Rebid
Infrastructure
Results
$397,500 CJ est. value
Mazomanie, WI 53560

Slab Repairs Parking Garage 80
Alteration
Results
$300,000 est. value
Madison, WI

Residence Hall Renovation - GPC
Renovation
Construction
$1,913,000 CJ est. value
Madison, WI 53706

Engineering Hall Roof Replacement - General Bid
Renovation
Construction
$1,245,332 CJ est. value
Madison, WI 53706

Crushed Stone and Gravel
Term Contract
Post-Bid
Madison, WI 53715

Underground Utilities Installation - GC
Infrastructure
Results
$580,000 CJ est. value
Madison, WI 53704

Remodel Latrine and Replace Shop Ventilation Madison Aviation Armory - GPC
Renovation
Construction
$1,239,789 CJ est. value
Madison, WI 53704

Asphaltic Concrete Products
Term Contract
Post-Bid
Madison, WI 53715

Building 6 Remodel - Central Wisconsin Center - AAC
Renovation
Results
$115,444 CJ est. value
Madison, WI 53704

Sprinkler Nitrogen Generator Addition Risser Justice Center
Renovation
Construction
$196,213 CJ est. value
Madison, WI 53703

culverts
Term Contract
Post-Bid
Madison, WI 53715

Last Updated 01/08/2024 09:26 AM
Project Title

Smith's Crossing Community Park Pavilion and Restroom Building

Physical Address View project details and contacts
City, State (County) Sun Prairie, WI 53590   (Dane County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate - 12/15/23
Owner View project details and contacts
Architect View project details and contacts
Description

From the information provided by the client, it is understood that the proposed development will consist of a new restroom building, pavilion, concrete pavement, asphalt trail, and utilities. The pavilion and restroom are estimated to be supported by frost depth spread footings. Proposed pavements will be flexible asphalt and rigid concrete. Primarily, pavements will be used for pedestrian traffic and will be used for occasional maintenance truck traffic. Traffic loading details were not provided. Proposed utilities include a new gravity 8-inch diameter sanitary sewer and a new 8 or 12-inch diameter watermain. Utility bearing depths were not provided but are estimated to be less than 15 feet below existing grades. Structural loads were not provided but are estimated to be light to moderate in magnitude. It is understood that the finished floor elevation of the new restroom will be about EL 947 and the finished floor of the new pavilion will be about EL 940. The invert elevations of utilities were not provided by the client. Elevations at the borings located within the proposed pavilion and restroom ranged from about EL.941 to EL. 947. Based upon elevations in the area of the proposed pavilion (EL. 941) and restroom (EL. 947), cuts of about 2 feet and fills of about 2 feet are estimated to be required to establish the floor slab elevation, respectively. However, this will also be dependent on the subgrade preparation criteria, to be discussed in a later section of this report Questions received less than ten days prior to the date for opening of Bids may not be answered.

Details

1 Story Above Grade, 3,900 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents