Similar Projects
Chenman - Phase II
New Construction, Infrastructure - 81,650 SF
Design
$16,000,000 CJ est. value
Norfolk, VA 23517

Tennis Court Repairs
Infrastructure
Design
$200,000 CJ est. value
Virginia Beach, VA 23451

Norfolk Zoo Trail of the Tiger Boardwalk Repairs
Build-out, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Norfolk, VA 23504

Storm Water System Upgrade FY23
Infrastructure
Bidding
$300,000 CJ est. value
Norfolk, VA 23510

River Star Homes- Residential BMP Construction
Post-Bid
Norfolk, VA

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Demolition and Site Restoration - 400 Saint Paul's Boulevard
Results
Norfolk, VA 23510

Flange to Flange Plug Valve - VIP
Results
Hampton, Norfolk, VA 23508

P-1127U Composite Shop and P-1137U O2N2 Gas Shop
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Norfolk, VA 23511

Owens House - New Residence Hall - 48th Street Parking
Infrastructure
Bidding
$700,000 CJ est. value
Norfolk, VA 23508

Cap for Virginia Beach Landfill No. 2
Infrastructure
Post-Bid
Virginia Beach, VA 23464

Subgrade Stabilization
Infrastructure
Results

Apartments / Norfolk
New Construction, Infrastructure, Alteration
Design
$35,000,000 est. value
Norfolk, VA 23518

Hampton Roads Community Health Center (HRCHC) Medical Build Out
New Construction, Infrastructure - 19,300 SF
Bidding
$15,000,000 CJ est. value
Norfolk, VA 23505

Royal Farms #471 / Norfolk
New Construction, Infrastructure - 5,200 SF
Post-Bid
$1,400,000 CJ est. value
Norfolk, VA 23518

Last Updated 08/29/2022 12:07 PM
Project Title

Raw Water Facilities Red Top to Lake Gaston Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Chesapeake, VA 23504   (Norfolk City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Raw Water Facilities Red Top to Lake Gaston Water Treatment Plant Section D (Station 136+59 to Station 210+00) The Work under this Project consists of the furnishing materials and installation of approximately 7,341 linear feet of 36-inch IPS DR17 high density polyethylene (HDPE) raw water main pipe and appurtenances generally parallel to Route 58 between Wilroy Road and Nansemond Parkway. The Work also includes approximately 251 linear feet of bore and jack installation of three 48 steel casings and wetland restoration. This project is Section D of the total water main project. The work shall include all pipe, valves, air release valves, and related appurtenances. Existing sections were installed by others and the extent of the previous work is shown on the drawings. The contractor shall connect the Section D water main to the previously installed Section C and the HDD crossing of the Nansemond River.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents